MW14-01B / BH5 / CFD-0434 (Page 1 of 1) Drilling Started: Sep 1, 2014 Northing Coord.: 6,975,002.66 Install Completed: Sep 4, 2014 Easting Coord.: 583,995.31 Drilling Method: Diamond / HQ Ground Surface: 1177.01 m amsl Drilling Company: CYR Drilling Ltd. Logged By: Kaminak Coffee Creek Gold Supervised By: SK/JY/LF Checked By: LF Project #: A362-4 Water Level: 1027.75 m amsl 08-Sep-14 @ 12:55 Well: Collapsed RQD Elev.: 1177.01 m amsl (%) DESCRIPTION 0 50100 K (m/s) (mbgs) Depth (m) Depth (m) Fracture = Fr Fault = Flt Packer Interval Elev. (m amsl)1177.01 0 0 1175 OVERBURDEN Surface Casing GNEISS Mix felsic gneiss & biotite schist, dark green, fine-coarse, moderate-strong chlorite alteration, variable weak - no oxide 20 20 1155 See MW14-01A for more details 40 40 1135 Void N/A N/A N/A 60 60 1115 2" Sched. 40 PVC 80 80 1095 100 100 1075 Cement Grout 120 120 1055 140 140 1035 Bentonite Pellets Filter Sand Screen 160 160 1015 EOH @ 160 m N/A: Hole not logged for structure or packer tested 03-04-2016 P:\A362-4 (Coffee Gold Project - Hydrogeology)\Data\BH Logs\Quicklog\2014\MW14-01B.bor 180 180