MW14-02A / BH9 / CFD-0428 (Page 1 of 2) Drilling Started: Sep 25, 2014 Northing Coord.: 6,973,507.99 Install Completed: Sep 28, 2014 Easting Coord.: 583,993.73 Drilling Method: Diamond / HQ Ground Surface: 1029.54 m amsl Drilling Company: CYR Drilling Ltd. Logged By: Kaminak Coffee Creek Gold Supervised By: MS/RC/CB Checked By: LF Project #: A362-4 Water Level: 1025.81 m amsl 11-Oct-14 @ 13:30 Well: MW14-02A, partially frozen RQD Elev.: 1030.54 m amsl (TOC) (%) DESCRIPTION 0 50100 K (m/s) (mbgs) Depth (m) Depth (m) Fracture = Fr Packer Test Interval Elev. (m amsl)1029.54 Fault = Flt ; Joint = J Stick-up 0 0 OVERBURDEN J(73) Surface Casing 1025 BIOTITE-FELDSPAR SCHIST Biotite schist, 10% pervasive-fractured oxide 10 10 (surface weathering?), 0.5% fractured limotite Fr Fr 1015 Fr Fr Fr 20 20 J(11) 1005 30 30 FELSIC GNEISS Massive pink hard felsic gneiss 995 J(21) N/A N/A 40 40 985 GNEISS Cement Grout 50 50 Biotite schist, moderate fracturing, weak 2" Sched. 40 PVC fractured clay, 10% pervasive-fractured oxide (surface weathering?), 0.5% fractured 975 Fr limonite J((6) 60 60 965 70 70 Fr 955 J(18) 80 80 Fr 945 *85.3 to 85.5 m some circulation loss 90 90 935 BIOTITE-FELDSPAR SCHIST Biotite schist J(22) 100 100 ANDESITE Mafic dykes intruding biotite schist, weak 03-04-2016 P:\A362-4 (Coffee Gold Project - Hydrogeology)\Data\BH Logs\Quicklog\2014\MW14-02A.bor fractured clay, dark orange fracture staining MW14-02A / BH9 / CFD-0428 (Page 2 of 2) Drilling Started: Sep 25, 2014 Northing Coord.: 6,973,507.99 Install Completed: Sep 28, 2014 Easting Coord.: 583,993.73 Drilling Method: Diamond / HQ Ground Surface: 1029.54 m amsl Drilling Company: CYR Drilling Ltd. Logged By: Kaminak Coffee Creek Gold Supervised By: MS/RC/CB Checked By: LF Project #: A362-4 Water Level: 1025.81 m amsl 11-Oct-14 @ 13:30 Well: MW14-02A, partially frozen RQD Elev.: 1030.54 m amsl (TOC) (%) DESCRIPTION 0 50100 K (m/s) (mbgs) Depth (m) Depth (m) Fracture = Fr Packer Test Interval Elev. (m amsl)1029.54 Fault = Flt ; Joint = J 105 105 920 115 115 910 J(22) 125 125 Fr Fr 900 135 135 Cement Grout N/A N/A GABBRO 890 J(28) Gabbro, coarse, varying orange oxide bands 145 145 Fr 2" Sched. 40 PVC 880 155 155 870 J(3) HYDROTHERMALLY ALTERED ROCK Breccia zone overlaps gabbro-biotite schist 165 contact around 180.3m. At 184 m, increased 165 brecciation with stronger pervasive oxide 860 CARBONATE +/- LIMONITE MTX BX Clasts in orange & white carbonate matrix 175 (dolomite, ankerite) 175 Bentonite Pellets 850 185 185 HYDROTHERMALLY ALTERED ROCK Crackle breccia. At 189.9 m, less intensely Filter Sand 840 yet strong fracturing with carbonate infill Screen *193 m some circulation loss 195 195 EOH @ 197 m 830 N/A: Hole not packer tested *Comment from supervising hydrogeologist, all other descriptons provided by Kaminak 205 205 Number of joints reported for every 20 m interval 03-04-2016 P:\A362-4 (Coffee Gold Project - Hydrogeology)\Data\BH Logs\Quicklog\2014\MW14-02A.bor