MW14-05B / BH11 / CFD-0455 (Page 1 of 1) Drilling Started: Sep 17, 2014 Northing Coord.: 6,972,998.51 Install Completed: Sep 20 , 2014 Easting Coord.: 579,694.92 Drilling Method: Diamond / HQ Ground Surface: 1270.3 m amsl Drilling Company: CYR Drilling Ltd. Logged By: Kaminak Coffee Creek Gold Supervised By: JH/JB/MS Checked By: LF Project #: A362-4 Water Level: 1136.32 m amsl 11-Oct-14 @ 15:53 Well: MW14-05B RQD Elev.: 1270.9 m amsl (TOC) (%) DESCRIPTION 0 50100 (m/s) K (mbgs) Depth (m) Fault = Flt Fracture = Fr Depth (m) Packer Test Interval Elev. (m amsl)1270.3 Surface Monument & Casing stickup 0 1270 0 Bentonite Pellets GRANITE Fresh coarse grained granite, patchy clay alteration of feldspar, typically associated with fractures, weak to moderate fracture controlled limonite. 20 1250 20 See MW14-05A for details 40 1230 40 N/A N/A N/A 60 1210 60 2" Sched. 80 PVC 80 1190 80 Cement Grout 100 1170 100 120 1150 120 140 1130 140 Bentonite Pellets 160 1110 160 Suspected cave-in Filter Sand Screen 180 1090 180 EOH @ 179.5 m N/A: Borehole not packer tested or logged for structure 03-04-2016 P:\A362-4 (Coffee Gold Project - Hydrogeology)\Data\BH Logs\Quicklog\2014\MW14-05B.bor 200 200