MW15-01AZ / BH08-AZ / CFR-0982 (Page 1 of 1) Drilling Started: May 5,2015 Drilling Method: Casing Advance ODEX Install Completed: May 5,2015 Drilling Company: Northspan Drilling Diameter(s): 4.5 " Supervised By: JH (Lorax) Total Depth: 5.94 mbgs Logged By: Kaminak Coffee Creek Gold Completion Depth: 5.90 mbgs Checked By: LF Project #: A362-4 ODEX Casing: pulled Easting: 585,683.0 m PVC Stickup: 0.55 m ags Northing: 6,976,037.9 m Water Level: frozen @ 3.79 m (8-Jul-15) No free water in well Top of PVC: 810.30 m asl Elevation: 809.75 m asl Survey Type: RTK GPS Steel monument and concrete pad LITHOLOGY Elev. (masl) Depth (m) Depth (m) 0 0 OVERBURDEN-Colluvium *Organic material. Bentonite Pellets OVERBURDEN *Gravel, boulders. 809 1 1 808 2 2 2" Sch. 80 PVC OVERBURDEN *Sand, silt and gravel. Moisture observed on fines at 2.3 m. 807 3 3 Screen No.10 Slot 806 OVERBURDEN 10-20 Sand Pack *Brown silt, sand, gravel. 4 4 805 SCHIST end cap *Harder drilling, dusty. 5 5 804 6 6 End of hole at 5.94 m (19.5 ft) *Comment from supervising hydrogeologist. Datum: UTM NAD83 Zone 7 803 03-04-2016 P:\A362-4 (Coffee Gold Project - Hydrogeology)\Data\BH Logs\Quicklog\2015\Version 2 (LF)\BH08AZ.bor 7 7