MW15-01WB / BH8-WB / CFR-0977 (Page 1 of 2) Drilling Started: April 30,2015 Drilling Method: Casing Advance & RC Install Completed: May 05,2015 Drilling Company: Northspan Drilling Diameter(s): 6.0" & 4.5" Supervised By: JH/AS/CS (Lorax) Drilled Depth: 118.56 m Logged By: Kaminak Coffee Creek Gold Completion Depth: 116.72m Checked By: LF Project #: A362-4 Surface Casing Stickup: 1.4 m ags Casing Depth: 21.3 mbgs Easting: 585,828.6 m HQ Stickup: 1.56 m ags HQ Depth: 76.12 mbgs Northing: 6,976,211.9 m Westbay Stickup: 1.67 m ags Water Level: 36.0 m bgs Westbay Depth: 117.0 m bgs Elevation: 803.58 m asl (8-Jul-15; Port 4) Survey Type: RTK GPS LITHOLOGY pH EC Elev. (masl) Surface (µS/cm) Depth (m) Airlift Yield Depth (m) (USGPM) monument 0 0 +casing 803 Not logged to 17.1 m See MW15-01T for details 10 10 793 FELSIC GNEISS Fresh 20 20 783 HQ Rods Not Logged 30 30 773 Westbay MP38 40 40 763 FELSIC GNEISS clay-sericite alteration Not Logged 50 50 753 60 60 03-04-2016 P:\A362-4 (Coffee Gold Project - Hydrogeology)\Data\BH Logs\Quicklog\2015\Version 2 (LF)\BH08WB_2.bor Bentonite Seal MW15-01WB / BH8-WB / CFR-0977 (Page 2 of 2) Drilling Started: April 30,2015 Drilling Method: Casing Advance & RC Install Completed: May 05,2015 Drilling Company: Northspan Drilling Diameter(s): 6.0" & 4.5" Supervised By: JH/AS/CS (Lorax) Drilled Depth: 118.56 m Logged By: Kaminak Coffee Creek Gold Completion Depth: 116.72m Checked By: LF Project #: A362-4 Surface Casing Stickup: 1.4 m ags Casing Depth: 21.3 mbgs Easting: 585,828.6 m HQ Stickup: 1.56 m ags HQ Depth: 76.12 mbgs Northing: 6,976,211.9 m Westbay Stickup: 1.67 m ags Water Level: 36.0 m bgs Westbay Depth: 117.0 m bgs Elevation: 803.58 m asl (8-Jul-15; Port 4) Survey Type: RTK GPS LITHOLOGY EC Elev. pH (µS/cm) (masl) Depth (m) Airlift Yield (USGPM) Depth (m) 65 65 738 FELSIC GNEISS HQ Rods bleached, clay-sericite altered FELSIC GNEISS fresh 75 75 728 FELSIC GNEISS Port 6 Weakly serricite altered Bentonite FELSIC GNEISS Seal fresh Port 5 *77.7 m less dusty drilling Port 4 n/a n/a 4.9 FELSIC GNEISS 85 85 Primary oxidized, silicified, 0.5% dissemianted limonite 718 Zone 2 *82.1 m hit water *82.6 m cuttings show signs of reddish brown Packer n/a n/a 5.4 Port 3 staining FELSIC GNEISS Westbay fresh MP38 n/a n/a 2 95 95 708 FELSIC GNEISS n/a n/a 4 fresh n/a n/a 5 105 MIXED MAFIC GNEISS 105 698 fresh, biotite rich n/a n/a 6 Packer Port 2 Primary Zone 1 Packer 115 MIXED MAFIC GNEISS 115 Port 1 688 bleached MIXED MAFIC GNEISS bleached End of hole 118.6 m (389 ft). *Comment from supervising hydrogeologist; lithology logged by Kaminak Primary Zone 2 was sampled 125 125 Datum: UTM NAD83 Zone 7 03-04-2016 P:\A362-4 (Coffee Gold Project - Hydrogeology)\Data\BH Logs\Quicklog\2015\Version 2 (LF)\BH08WB_2.bor