MW15-02AZ / BH10-AZ / CFR-0995 (Page 1 of 1) Drilling Started: May 24,2015 Drilling Method: Casing Advance ODEX Install Completed: May 24,2015 Drilling Company: Northspan Drilling Diameter(s): 4.5 " Supervised By: JY/LF (Lorax) Drilled Depth: 10.3 mbgs Logged By: LF Coffee Creek Gold Checked By: LF Project #: A362-4 ODEX Casing: pulled Easting: 584,857.8 m PVC Stickup: 0.68 m Northing: 6971754.5 m Water level: 5.5 m bgs (11-Jul-15) Top of PVC: 737.93 m asl Elevation: 737.25 m asl Survey Type: RTK GPS Steel moument and concrete pad LITHOLOGY Elev. (masl) Depth (m) Depth (m) 0 0 *OVERBURDEN 737 Bentonite Pellets *Not logged. 1 1 736 2" Sch. 80 PVC 2 2 735 3 3 734 4 4 *Damp ~4.0 m. 733 5 5 732 6 6 731 Screen 1mm slots 7 7 730 *Some drizzle at 7.3 m bgs. 8 8 729 10-20 Sand Pack *SCHIST 9 9 *Not logged 728 10 10 727 end cap End of hole at 10.3 m (34 ft). *Comment from supervising hydrogeologist. 11 11 Datum: UTM NAD83 Zone 7 726 12 12 03-04-2016 P:\A362-4 (Coffee Gold Project - Hydrogeology)\Data\BH Logs\Quicklog\2015\Version 2 (LF)\BH10AZ.bor