MW15-02T / BH10-T / CFR-0948 (South Dump D/S) (Page 1 of 1) Drilling Started: March 25,2015 Drilling Method: Casing Advance & Convent. Install Completed: March 26,2015 Drilling Company: Northspan Drilling Diameter(s): 6.0" & 4.5" Supervised By: LF/AS/CS (Lorax) Total Depth: 34.4 mbgs Logged By: Kaminak Coffee Creek Gold Completion Depth: 33.7 mbgs Checked By: LF Project #: A362-4 Depth to Bedrock: 10.7 mbgs Easting: 584,854.9 Casing Depth: 17.7 mbgs Northing: 6,971,756.0 Stick up: 0.38 m Elevation 737.1 Survey Type: Handheld +/-8m LITHOLOGY Elev. (masl) (GPM)** Depth (m) Fracture = Fr Fault = Flt Airlift Yield Depth (m) Surface monument datalogger enclosure 0 0 OVERBURDEN Thermistor (1.2m) Brown to light dirty orange felsic gneiss, granite and schist. 735 *Colluvium ranging from sitly sand to bouldery Thermistor (3.2 m) sections. Visibly frozen 0-2.4 m. *Water present at casing weld at 7 m, may have 5 5 Thermistor (5.2 m) orginated between 5.5-7m (flow not sustained). Present 730 6" Welded Surface Casing (0-17.7m) 10 10 Thermistor (10.2 m) SCHIST Light grey to green, well foliated schist. Moderately chlorite altered. 725 *Small fracture at 45 ft (13.8 m), 50 ft (15.2 m) 15 15 Thermistor (15.2 m) 720 0.25 SCHIST Light grey to green, well foliated schist. Common strained feldspr and pyrite blebs. Moderately chlorite 20 20 altered. 3 *Broken area with iron stained surfaces 68-72 ft Cement grout (20.7-21.9m). Interval grabs onto rods (cave). 715 15-20 Thermistor (24.2 m) 25 25 1" Sch. 80 PVC Tremmie 15-20+ SILTY SAND, *Fractured area ~26 m, water increases 710 but not measurable at cyclone. 30 30 SCHIST Dark grey to greenish biotite schist. Increased pervasive chlorite alteration. Common pyrite. 705 Decrease in feldspar/quartz content. VWP (33.9m) Slough RST Model DT2055-B Multichannel Data logger S/N: 35 35 3686 Logging Frequency: 4 hrs Thermistor string (0-24 m) S/N: TS3798 700 VWP (33.9 m) 1MPa, S/N: 30460 *Comment from supervising hydrogeologist; all other descriptions provided by Kaminak **Visual estimations of flow only. 03-04-2016 P:\A362-4 (Coffee Gold Project - Hydrogeology)\Data\BH Logs\Quicklog\2015\Version 2 (LF)\BH10T.bor 40 40