MW15-02WB / BH10-WB / CFR-0997 (Page 1 of 2) Drilling Started: May 22,2015 Drilling Method: Casing Advance & RC Install Completed: May 24,2015 Drilling Company: Northspan Drilling Diameter(s): 6.0" & 4.5" Supervised By: VS/JY/LF (Lorax) Drilled Depth: 66.4m Logged By: Kaminak Coffee Creek Gold Checked By: LF Project #: A362-4 Casing Depth: 10.1 m bgs Easting: 584,857.7 Surface Casing Stickup: 0.93 m ags HQ: not deployed Northing: 6,971,757.8 Westbay Stickup: 1.06 m ags Water Level: 2.4 m bgs Westbay Depth: 65.5 m bgs Elevation: 737.11 (10-Jul-15; Port 3) Survey Type: RTK GPS LITHOLOGY EC Elev. pH (µS/cm) (masl) Depth (m) Airlift Yield (USGPM) Depth (m) Surface monument 0 0 737 casing *OVERBURDEN *Loose sand and gravel with variable silt content, occasional cobble/boulders. Moist to dry 0-0.9m, possibly frozen. *Moist 0.9-7.3 m. 5 5 732 moist *Moist to wet 7.3-8.5 m. Small amount of water returned at cyclone after casing weld at 8.5 m. Packer Port 5 BIOTITE SCHIST 10 Weakly oxidized, weak sericite. *Variably fractured 10 727 throughout hole. Westbay MP38 *Not sampled. w/ Glycol BIOTITE SCHIST Weak clay and sericite alteration. Packer Port 4 *Not sampled. 15 BIOTITE SCHIST 15 722 Patchy blebs of brassy pyrite (0.1%), weak patchy chlorite. 9.4 923 5 BIOTITE SCHIST 20 20 717 Weak clay alteration, moderate chlorite alteration. 0 0 Spotty *Intermittent wet and dry patches encountered 23.8-28.3 m. 25 25 712 Packer Port 3 Primary BIOTITE SCHIST Zone 2 (Sampled) Generally fresh, weak patchy chlorite. 8.4 1007 0 30 *Two separate fractures noted at 29, 29.7 m. 30 707 *Zero water during spot airlift measurement at 29.9 m, water appears to be lost to fractures. 8.4 1006 35 Packer Port 2 *Formation grabby at 32.3 m. 8.4 992 8 03-04-2016 P:\A362-4 (Coffee Gold Project - Hydrogeology)\Data\BH Logs\Quicklog\2015\Version 2 (LF)\BH10WB.bor 35 35 MW15-02WB / BH10-WB / CFR-0997 (Page 2 of 2) Drilling Started: May 22,2015 Drilling Method: Casing Advance & RC Install Completed: May 24,2015 Drilling Company: Northspan Drilling Diameter(s): 6.0" & 4.5" Supervised By: VS/JY/LF (Lorax) Drilled Depth: 66.4m Logged By: Kaminak Coffee Creek Gold Checked By: LF Project #: A362-4 Casing Depth: 10.1 m bgs Easting: 584,857.7 Surface Casing Stickup: 0.93 m ags HQ: not deployed Northing: 6,971,757.8 Westbay Stickup: 1.06 m ags Water Level: 2.4 m bgs Westbay Depth: 65.5 m bgs Elevation: 737.11 (10-Jul-15; Port 3) Survey Type: RTK GPS LITHOLOGY EC Elev. pH (µS/cm) (masl) Depth (m) Airlift Yield (USGPM) Depth (m) 35 35 702 *Not sampled. VEIN 8.5 997 8 Pure milky quartz. *Not sampled. BIOTITE SCHIST 40 40 697 Weak patchy chlorite, rare brassy pyrite blebs (0.1%) 8.5 963 4 Westbay MP38 w/ Glycol 45 45 8.5 873 17 692 8.5 955 17 50 50 687 8.5 960 12 BIOTITE SCHIST Patchy quartz veining. 8.0 960 12 8.3 960 10** 55 55 682 8.3 995 9** 8.4 955 8** 8.3 950 60 60 677 8.6 960 25** Packer Port 1 8.2 960 20** 8.5 960 11** Primary Zone 1 8.3 960 20** 65 65 672 Slough 8.3 965 14** End of hole at 66.4 m (218 ft). *Comment from supervising hydrogeologist; lithology logged by Kaminak geologist. **Trapped air visible during airflow measurements, values may be inaccurate. 03-04-2016 P:\A362-4 (Coffee Gold Project - Hydrogeology)\Data\BH Logs\Quicklog\2015\Version 2 (LF)\BH10WB.bor 70 70