MW15-03AZ / BH12-AZ / CFR-0986 (Page 1 of 1) Drilling Started: May 9,2015 Drilling Method: Casing Advance ODEX Install Completed: May 9,2015 Drilling Company: Northspan Drilling Diameter(s): 4.5 " Supervised By: AS (Lorax) Total Depth: 5.62 mbgs Logged By: Kaminak Coffee Creek Gold Completion Depth: 5.55 mbgs Checked By: LF Project #: A362-4 ODEX Casing: pulled Easting: 585,582.5 m Stickup: 0.66 m Northing: 6,978,157.3 m Water level: 1.65 m bgs (9-Jul-15) Top of PVC: 558.60 m asl Elevation: 557.94 m asl Survey Type: RTK GPS Steel moument and concrete pad LITHOLOGY Elev. (masl) Depth (m) Depth (m) 0 0 *OVERBURDEN (Not logged) Bentonite Seal ( DTW 1.415 mbtoc) 10/05/2015 557 1 1 556 2" Sch. 80 PVC 2 2 555 3 3 554 4 4 2" Sch. 80 PVC Screen 553 10-20 Sand Pack 5 5 end cap 552 6 6 Datum: UTM NAD83 Zone 7 551 7 7 03-04-2016 P:\A362-4 (Coffee Gold Project - Hydrogeology)\Data\BH Logs\Quicklog\2015\Version 2 (LF)\BH12AZ.bor