MW15-03T / BH12-T / CFR-0983 (Page 1 of 2) Drilling Started: May 05,2015 Drilling Method: Casing Advance & RC Install Completed: May 10,2015 Drilling Company: Northspan Drilling Diameter(s): 6.0" & 4.5" Supervised By: JH/AS (Lorax) Drilled Depth: 98.14 m along hole (AH) Logged By: Kaminak Coffee Creek Gold Checked By: LF Project #: A362-4 Casing Depth: 11.9m along hole Easting: 585,584.5. m Hole Dip: 80° Northing: 6,978,167.8 m Installation depths along hole (m AH) Elevation: 557.75 m asl Survey Type: RTK GPS LITHOLOGY pH EC (uS/cm) Elev. (masl) Airlift Yield (USGPM) Depth Along Hole (m) Steel Enclosure Housing Datalogger 0 OVERBURDEN 557 Bentonite *Fine to coarse colluvium. Saturated. Thermistors (0.55, 1.25, 1.95, 2.61, 3.44, 4.18, 4.95 m AH) 5 MIXED MAFIC GNEISS 552 Weak pervasive epidote and silica. MIXED MAFIC GNEISS 6" Welded Surface Weak pervasive silica. Casing (0-11.9m) 10 *Flat, thin shards of ice observed in cuttings - possibly 547 frozen fractures (8.8-10.4 m) BIOTITE SCHIST Weak chlorite and sericite. MIXED MAFIC GNEISS 15 542 Moderate pervasive silica. *Chip samples collected every 10 ft. Thermistor (17.17 m) 20 537 Cement grout 25 532 *Moisture observed (26.5 m). Thermistor (29.32 m) 30 527 1" Sch. 80 PVC Tremmie 2.4 *Water encountered (36.5 m). 35 522 3 10 9.8 40 517 Thermistor (41.59 m) 11.5 10 45 10 512 bentonite 15 *Chip size suggests fractured ground (48.2m). 50 MIXED MAFIC GNEISS VWP 1 (50.3 m) 507 Mixed with massive quartz vein. 30 QUARTZ VEIN MIXED MAFIC GNEISS Thermistor (53.88 m) 30 Mixed with massive quartz vein. 03-04-2016 P:\A362-4 (Coffee Gold Project - Hydrogeology)\Data\BH Logs\Quicklog\2015\Version 2 (LF)\BH12T.bor 55 MW15-03T / BH12-T / CFR-0983 (Page 2 of 2) Drilling Started: May 05,2015 Drilling Method: Casing Advance & RC Install Completed: May 10,2015 Drilling Company: Northspan Drilling Diameter(s): 6.0" & 4.5" Supervised By: JH/AS (Lorax) Drilled Depth: 98.14 m along hole (AH) Logged By: Kaminak Coffee Creek Gold Checked By: LF Project #: A362-4 Casing Depth: 11.9m along hole Easting: 585,584.5. m Hole Dip: 80° Northing: 6,978,167.8 m Installation depths along hole (m AH) Elevation: 557.75 m asl Survey Type: RTK GPS LITHOLOGY pH EC (uS/cm) Elev. (masl) Airlift Yield (USGPM) Depth Along Hole (m) 55 502 QUARTZ VEIN 30 AMPHIBOLE BEARING SCHIST Moderate sericite and weak epidote alteration. 60 30 497 30 AMPHIBOLE BEARING SCHIST 65 Weak patchy sericite and epidote. 492 Missing chips; samples collect every 10 ft. Thermistor (66.14 m) 30 Cement grout 30 70 487 30 75 28 482 Thermistor (78.41 m) 30 80 477 1" Sch. 80 PVC Tremmie 33 85 472 30 90 467 25.3 95 26.9 462 VWP 2 (97.7 m) End of Hole 98.2 m Datum: UTM NAD83 Zone 7 100 457 Geology & Construction based on drill length along hole *Comments from supervising hydrogeologist, litholgy logged by Kaminak RST Model DT2040 Multichannel Data logger S/N: 105 452 DT2037 Thermistor string S/N: TS3969 VWP 1, 1MPa S/N: 30461; VWP 2, 1MPa S/N: 32594 03-04-2016 P:\A362-4 (Coffee Gold Project - Hydrogeology)\Data\BH Logs\Quicklog\2015\Version 2 (LF)\BH12T.bor 110