MW15-03WB / BH12-WB / CFR-0987 (Page 1 of 2) Drilling Started: May 10,2015 Drilling Method: Casing Advance & RC Install Completed: May 12,2015 Drilling Company: Northspan Drilling Diameter(s): 6.0" & 4.5" Supervised By: JH/AS (Lorax) Drilled Depth: 99.52m Logged By: Kaminak Coffee Creek Gold Checked By: LF Project #: A362-4 Surface Casing Stickup: 0.42 m ags Casing Depth: 10.4 mbgs Easting: 585,581.4 m HQ Rods Stickup: 0.57 m abs HQ Depth: 33.5 mbgs Northing: 6,978,164.6 m Westbay Stickup: 0.78 m ags Water Level: 1.8 m above ground Westbay Depth: 99.3 mbgs Elevation: 557.92 m asl (9-Jul-15; Port 6) Survey Type: RTK GPS LITHOLOGY Elev. pH EC Airlift (masl) (uS/cm) Depth (m) (USGPM) Depth (m) Surface monument 0 0 casing OVERBURDEN 557 *Water return at 1.2 m 5 5 552 FELSIC GNEISS Weathered. MAFIC MIXED GNEISS Very small black mafic chips with muscovite mixed with 10 10 mod silicified felsic chips. Fresh. 547 *Flat, platey ice fragments observed in cuttings representing possible frozen fractures 7.7 m, 8.2 m, 8.5-10.4 m. HQ Rods No samples. 15 15 542 Westbay MP38 MAFIC MIXED GNEISS w/ Glycol Moderately silicified. 20 20 No samples. 537 MAFIC MIXED GNEISS 25 25 Moderately silicified. 532 No samples. 9.6 2.1 BIOTITE SCHIST 30 Fresh with weak muscovite. 30 Packer 527 Not sampled. Port 8 MAIFC MIXED GNEISS 9.9 5.3 Weak chlorite after mafics, 0.1% diss brassy pyrite. 35 35 Packer 522 Not sampled. Port 7 9.9 5.1 FELSIC MIXED GNEISS bleached from moderate sil-ser, 5% vein qtz. 40 40 9.5 5.1 517 MIXED MAFIC GNEISS Weak patchy chlorite after mafics and weak patchy sil ser. 0.1% diss cubic pyrite. Interval switches: 58.8-60.4 9.2 5.5 m, 60.4-61 m, 61-62.5 m, 62.5-63 m. 45 45 512 Packer 9.3 4.5 Port 6 Primary Zone 3 (Sampled) 8.8 6 50 50 Packer 507 Port 5 6.5 6 03-04-2016 P:\A362-4 (Coffee Gold Project - Hydrogeology)\Data\BH Logs\Quicklog\2015\Version 2 (LF)\BH12WB V2.bor 55 55 MW15-03WB / BH12-WB / CFR-0987 (Page 2 of 2) Drilling Started: May 10,2015 Drilling Method: Casing Advance & RC Install Completed: May 12,2015 Drilling Company: Northspan Drilling Diameter(s): 6.0" & 4.5" Supervised By: JH/AS (Lorax) Drilled Depth: 99.52m Logged By: Kaminak Coffee Creek Gold Checked By: LF Project #: A362-4 Surface Casing Stickup: 0.42 m ags Casing Depth: 10.4 mbgs Easting: 585,581.4 m HQ Rods Stickup: 0.57 m abs HQ Depth: 33.5 mbgs Northing: 6,978,164.6 m Westbay Stickup: 0.78 m ags Water Level: 1.8 m above ground Westbay Depth: 99.3 mbgs Elevation: 557.92 m asl (9-Jul-15; Port 6) Survey Type: RTK GPS LITHOLOGY Elev. pH EC Airlift (masl) (uS/cm) Depth (m) (USGPM) Depth (m) 55 55 502 8.8 7 60 60 497 8.4 7.5 MIXED FELSIC GNEISS Moderate patchy sil bleaching, weak patchy chlorite 8.1 7.75 65 65 0.1% diss cubic pyrite. Interval switches every 3 ft. 492 Westbay 8.1 8 MP38 w/ Glycol 70 70 487 8.7 8 75 75 482 80 80 477 Packer Port 4 Primary 85 85 Zone 2 472 Not sampled. Packer Port 3 90 90 467 Packer Port 2 95 95 Primary 462 Zone 1 8.8 12 Packer Port 1 100 100 End of hole 100 m (328 ft). 457 Datum: UTM NAD83 Zone 7 *Comment from supervising hydrogeologist; lithology 105 105 logged by Kaminak 452 03-04-2016 P:\A362-4 (Coffee Gold Project - Hydrogeology)\Data\BH Logs\Quicklog\2015\Version 2 (LF)\BH12WB V2.bor 110 110