MW15-04AZ / BH04-AZ / CFR-0992 (Page 1 of 1) Drilling Started: May 14,2015 Drilling Method: Casing Advance ODEX Install Completed: May 14,2015 Drilling Company: Northspan Drilling Diameter(s): 4.5 " Supervised By: JY (Lorax) Total Depth: 5.72 mbgs Logged By: Kaminak Coffee Creek Gold Completion Depth: 5.72 mbgs Checked By: LF Project #: A362-4 ODEX Casing: pulled Easting: 584,016.4 m PVC Stickup: 0.47 m Northing: 6,976,566.0 m Water Level: Dry (9-Jul-2015) Top of PVC: 672.97 masl Elevation: 672.50 m asl Survey Type: RTK GPS Steel moument and concrete pad LITHOLOGY Elev. (masl) Depth (m) Depth (m) 0 0 *OVERBURDEN - Colluvium (Not Logged) *Trace moisture observed in upper half of hole, dry thereafter. 672 Bentonite Seal 1 1 2" Sch. 80 PVC 671 2 2 670 3 3 669 4 4 Screen No. 10 slot 668 5 5 *BEDROCK (not logged) 10/20 Sand Pack 667 end cap End of hole at 5.7 m. *Comment from supervising hydrogeologist. 6 Datum: UTM NAD83 Zone 7 6 666 03-04-2016 P:\A362-4 (Coffee Gold Project - Hydrogeology)\Data\BH Logs\Quicklog\2015\Version 2 (LF)\BH04AZ.bor 7 7