MW15-04WB / BH04-WB / CFR-0993 (Page 1 of 1) Drilling Started: May 15,2015 Drilling Method: Casing Advance & RC Install Completed: May 19,2015 Drilling Company: Northspan Drilling Diameter(s): 6.0" & 4.5" Supervised By: JY/LF (Lorax) Drilled Depth: 61.1 m Logged By: Kaminak Coffee Creek Gold Checked By: LF Project #: A362-4 Surface Casing Stickup: 0.383 m ags Casing Depth: 6.4 mbgs Easting: 584,024.0 m HQ Rods Stickup: 0.99 m HQ Depth: 30.4 mbgs Northing: 6,976,565.8 m Westbay Stickup: 1.06 m ags Water Level: 1.42 m above ground Westbay Depth: 60.85 mbgs Elevation: 671.46 m asl (9-Jul-15, Port 4) Survey Type: RTK GPS LITHOLOGY EC Elev. pH µS/cm (masl) Depth (m) Airlift Yield (USGPM) Depth (m) 0 0 671 *OVERBURDEN *Mix of organics and gravel. Surface *OVERBURDEN casing *Ranging from silty sand with gravel to silty fine sand. 5 5 666 *Damp at 1.5 m, 1.8-2.4 m (appears frozen). Not logged (no sample collected). MIXED FELSIC GNEISS 10 Fresh, minor mafic component. Weak patchy sil, weak 10 661 HQ Rods muscovite along chip fabric. 0.1% fc lim, 0.1% diss w/ Glycol brassy cubic pyrite. 15 15 656 Westbay MP38 20 20 w/Glycol 651 25 25 646 Packer Port 6 <1 Bentonite 30 30 Seal (Not 641 Tagged) Packer Port 5 10.8 801 1 35 35 9.2 770 2 636 8.3 717 1 Port 4 8.9 696 1-2 Primary 8.6 705 5 Zone 2 40 40 631 Port 3 trickle 8.5 705 trickle 8.2 710 8 45 45 626 8.2 782 12 8.2 742 12 8.4 744 40 50 50 621 8 760 24 FELSIC GNEISS Strong red hematite staining 47.2-48.8 m, moderate 8.2 767 11.5 patchy sil. 0.1% fc lim. Port 2 55 55 616 Primary Zone 1 8 775 12 Port 1 8.2 774 5 60 60 611 *Comments from supervising hydrogeologist; lithology by Kaminak. Primary Zone 2 was sampled. Datum: UTM NAD83 Zone 7 03-04-2016 P:\A362-4 (Coffee Gold Project - Hydrogeology)\Data\BH Logs\Quicklog\2015\Version 2 (LF)\BH04WB V2.bor 65 65