MW15-05AZ / BH02-AZ / CFR-0995 (Page 1 of 1) Drilling Started: May 20,2015 Drilling Method: Casing Advance ODEX Install Completed: May 20,2015 Drilling Company: Northspan Drilling Diameter(s): 4.5 " Supervised By: JY (Lorax) Drilled Depth: 5.72 mbgs Logged By: N/A Coffee Creek Gold Checked By: LF Project #: A362-4 ODEX surface casing: pulled Eastiing: 581,387.5 m PVC Stickup: 0.55 m ags Northing: 6,971,079.2 m Water Level: Dry (10-Jul-15)) Top of PVC: 1069.4 m asl Elevation: 1068.86 m asl Survey Type: RTK GPS Steel monument LITHOLOGY Elev. (masl) Depth (m) Depth (m) Concrete Pad 0 0 *OVERBURDEN - Colluvium *Not logged. Bentonite Seal 1068 2" Sch. 80 PVC 1 1 1067 2 2 1066 3 3 2" Sch. 80 PVC Screen 1mm slots 1065 10-20 Sand Pack 4 4 end cap 1064 *BEDROCK 5 *Not logged 5 1063 End of hole at 5.7 m. Datum: UTM NAD83 Zone 7 6 6 1062 03-04-2016 P:\A362-4 (Coffee Gold Project - Hydrogeology)\Data\BH Logs\Quicklog\2015\Version 2 (LF)\BH02AZ.bor 7 7