MW15-05WB / BH02-WB / CFR-0996 (Page 1 of 2) Drilling Started: May 20,2015 Drilling Method: Casing Advance & RC Install Completed: May 22,2015 Drilling Company: Northspan Drilling Diameter(s): 6.0" & 4.5" Supervised By: JY/VS/LF (Lorax) Drilled Depth: 82.9 mbgs Logged By: Kaminak Coffee Creek Gold Checked By: LF Project #: A362-4 HWT Stickup: 0.99 m ags Casing Depth: 6.7 mbgs Easting: 581,402.2 HQ Stickup: 1.15 m ags HQ Depth: 56.38 mbgs Northing: 6,971,084.0 Westbay Stickup: 1.29 m ags Water Level: 23.7 m bgs Westbay Depth: 82.7 mbgs Elevation: 1067.69 m asl (20-Jul-15; Port 3) Survey Type: RTK GPS LITHOLOGY EC Elev. pH (masl) Depth (m) Depth (m) Airlift Yield (USGPM) EC= µS/cm 0 0 1067 *OVERBURDEN *No recovery 0-0.6 m (top soil/muskeg). Silty sand to sand, bouldery in sections. Surface casing *Moist patch 3.7-5.2 m. 5 5 1062 *GRANITE *Weathered bedrock. GRANITE Weak patchy oxidation, and weak patchy clay. 10 10 1057 15 15 1052 Westbay MP38 w/Glycol 20 20 1047 HQ Rods w/ Glycol 25 25 1042 30 30 1037 35 35 1032 40 40 1027 GRANITE Moderate patchy oxidation, weak fracture controlled clay, fracture controlled limonite 0.1%, hematite 0.1%. 03-04-2016 P:\A362-4 (Coffee Gold Project - Hydrogeology)\Data\BH Logs\Quicklog\2015\Version 2 (LF)\BH02WB V2.bor 45 45 MW15-05WB / BH02-WB / CFR-0996 (Page 2 of 2) Drilling Started: May 20,2015 Drilling Method: Casing Advance & RC Install Completed: May 22,2015 Drilling Company: Northspan Drilling Diameter(s): 6.0" & 4.5" Supervised By: JY/VS/LF (Lorax) Drilled Depth: 82.9 mbgs Logged By: Kaminak Coffee Creek Gold Checked By: LF Project #: A362-4 HWT Stickup: 0.99 m ags Casing Depth: 6.7 mbgs Easting: 581,402.2 HQ Stickup: 1.15 m ags HQ Depth: 56.38 mbgs Northing: 6,971,084.0 Westbay Stickup: 1.29 m ags Water Level: 23.7 m bgs Westbay Depth: 82.7 mbgs Elevation: 1067.69 m asl (20-Jul-15; Port 3) Survey Type: RTK GPS LITHOLOGY EC Elev. pH (masl) Depth (m) Depth (m) Airlift Yield (USGPM) EC= µS/cm 45 45 1022 GRANITE Fresh. HQ Rods GRANITE w/ Glycol Moderate oxidation, moderate clay alteration, 50 disseminated hematite up to 0.25%. 50 1017 *Slightly damp patch 48.8-49.3 m. GRANITE Fresh. GRANITE Packer Weak oxidation, fracture controlled hematite up to Port 5 55 55 1012 0.1%. Westbay MP38 *Not sampled. w/Glycol *Water encountered at 54.9 m. GRANITE 12.3 1045 5 Bentonite Strong clay alteration, moderate oxidation, Seal 12.2 1630 (Not Tagged) 60 dissmeminated limonite/ hematite up to 1%. 60 1007 GRANITE 10.3 358 10 Packer Strong clay, bleached. Port 4 GRANITE Packer Moderate oxidation, weak fracture controlled clay Port 3 alteration, patchy disseminated hematite up to 0.25%. 9.9 338 3 65 65 Primary 1002 GRANITE 10.1 296 Zone 2 Generally fresh, weak fracture controlled oxidation. *Driller indicates that water is likely being blown into 10.5 321 2 Packer formation; hence lower airlift yields. Port 2 GRANITE 9.3 293 70 Weak-moderate oxidation, patchy weak fracture 70 9.1 302 5 997 controlled clay. Fracture controlled hematite up to 0.1%. 9.3 321 9 301 4 75 75 8.8 310 30 992 8.3 308 35 Packer Port 1 8.8 315 35 GRANITE Generally fresh, patchy clay bleaching. 8.4 303 80 80 Primary 987 Zone 1 8.5 310 8.5 320 35 End of hole 82.9 m (272 ft). 85 85 982 Primary Zone 2 was sampled *Comment from supervising hydrogeologist; all other descriptions provided by Kaminak Datum: UTM NAD83 Zone 7 03-04-2016 P:\A362-4 (Coffee Gold Project - Hydrogeology)\Data\BH Logs\Quicklog\2015\Version 2 (LF)\BH02WB V2.bor 90 90