MW15-06WB / BH05-WB / CFR-0999 (Page 1 of 3) Drilling Started: May 24,2015 Drilling Method: RC & DDH Install Completed: June 06,2015 Drilling Company: Northspan, CYR Drilling Diameter(s): 6.0", 4.5", 3.78" Supervised By: JY/VS/LF (Lorax) Drilled Depth: 293 mbgs Logged By: Kaminak Coffee Creek Gold Checked By: LF Project #: A362-4 HWT Stickup: 0.37 m ags HWT Depth: 162 mbgs Easting: 584,089.5 HQ Stickup: 0.62 m ags HQ Depth: 203.6 mbgs Northing: 6,975,003.3 Westbay Stickup: 0.62 m ags RC 6" 0-8.8m, 4.5" 8.8-200.3 m; Westbay Depth: #293# m bgs Elevation: 1184.95 m asl DDH HQ 200.3-293 m Survey Type: RTK GPS WL: 220.73 m bgs (15-Jul-15; Port 6) LITHOLOGY EC Elev. pH (masl) Depth (m) Depth (m) Airlift Yield (USGPM) EC= µS/cm 0 0 FELSIC GNEISS Weak zone. Moderate pervasive clay alteration, 1180 fracture controlled hematite and limonite up ot 0.5%. 5 5 10 1175 10 FELSIC GNEISS 1170 Weak zone. Red hematite stain, weak silica, clay, and 15 15 sericite alteration. Disseminated hematite and limonite up to 0.25%. 20 1165 20 1160 FELSIC GNEISS 25 25 Weak zone. Moderate clay alteration, weak silica. Dissminated hematite and limonite up to 0.5%. 1155 *Dark brown, slight damp with some visible ice 30 30 FELSIC GNEISS 35 1150 Weak patchy sericite and silica. 35 FELSIC GNEISS 1145 Moderate clay alteration, weak sericite. Disseminated 40 40 limonite up to 0.25%. 1140 MIXED FELSIC GNEISS 45 45 Patchy weak sericite and silica, weak fracture controlled clay, trace fracture controlled limonite up to 1135 0.1%. 50 50 55 1130 55 Westbay MP38 60 1125 60 w/ Glycol below 225m 1120 MIXED FELSIC 65 65 Moderate sericite, weak fracture controlled clay. HQ rods Disseminated limonite up to 0.1%. 70 1115 70 FELSIC GNEISS 1110 Weak sericite. Pink-Purple hematite stain. Weak silica. 75 75 HOST UNIT 1105 Zone. Strong clay alteration, disseminated hematite up 80 80 to 3%, limonite up to 1.5%. 1100 MIXED FELSIC GNEISS 85 85 Weak clay and sericite alteration. Fracture controlled limonite up to 0.1%. 90 1095 BIOTITE SCHIST 90 Coarse biotite. Frcture controlled hematite up to 0.1%. 95 1090 95 Port 12 FELSIC GNEISS 03-04-2016 P:\A362-4 (Coffee Gold Project - Hydrogeology)\Data\BH Logs\Quicklog\2015\Version 2 (LF)\BH05WB v3.bor 1085 Weak sericite and silica. Patchy pink hematite stain. 100 100 MW15-06WB / BH05-WB / CFR-0999 (Page 2 of 3) Drilling Started: May 24,2015 Drilling Method: RC & DDH Install Completed: June 06,2015 Drilling Company: Northspan, CYR Drilling Diameter(s): 6.0", 4.5", 3.78" Supervised By: JY/VS/LF (Lorax) Drilled Depth: 293 mbgs Logged By: Kaminak Coffee Creek Gold Checked By: LF Project #: A362-4 HWT Stickup: 0.37 m ags HWT Depth: 162 mbgs Easting: 584,089.5 HQ Stickup: 0.62 m ags HQ Depth: 203.6 mbgs Northing: 6,975,003.3 Westbay Stickup: 0.62 m ags RC 6" 0-8.8m, 4.5" 8.8-200.3 m; Westbay Depth: #293# m bgs Elevation: 1184.95 m asl DDH HQ 200.3-293 m Survey Type: RTK GPS WL: 220.73 m bgs (15-Jul-15; Port 6) LITHOLOGY EC Elev. pH (masl) Depth (m) Depth (m) Airlift Yield (USGPM) EC= µS/cm 100 100 MIXED MAFIC GNEISS Fresh Rock. Weak silica altertion. 105 1080 MIXED FELSIC GNEISS 105 Weak patchy zone. Weak patchy sericite alteration, patchy fracture controlled weak clay. Patchy fracture 1075 controlled hematite and limonite up to 0.5%. Patchy 110 110 clay bealching. 115 1070 115 120 1065 120 125 1060 125 130 1055 130 135 1050 135 1045 MIXED FELSIC GNEISS 140 140 Patchy moderate sercitite, weak fracture controlled 1040 clay, pathy pink hematite stain. 145 145 *No dust at 139.9 m, brown rock. Dust returns at 140.2m. Trace moisture after rod connected 142.3 m, 1035 145.3 m. 150 150 155 1030 155 Westbay 160 1025 160 MP38 w/ Glycol below 225m 165 1020 165 HQ rods 170 1015 170 1010 *Trace moisture 174.3 m. 175 175 180 1005 180 Port 11 1000 MIXED FELSIC GNEISS 185 185 Interbedded gneiss and schist. Silicified throughout. Patchy bleaching due to albite altn. Patchy chlorite and 190 995 epidote altn in mafic bands. Primary pink hematite 190 staining. 195 990 195 03-04-2016 P:\A362-4 (Coffee Gold Project - Hydrogeology)\Data\BH Logs\Quicklog\2015\Version 2 (LF)\BH05WB v3.bor 200 985 200 MW15-06WB / BH05-WB / CFR-0999 (Page 3 of 3) Drilling Started: May 24,2015 Drilling Method: RC & DDH Install Completed: June 06,2015 Drilling Company: Northspan, CYR Drilling Diameter(s): 6.0", 4.5", 3.78" Supervised By: JY/VS/LF (Lorax) Drilled Depth: 293 mbgs Logged By: Kaminak Coffee Creek Gold Checked By: LF Project #: A362-4 HWT Stickup: 0.37 m ags HWT Depth: 162 mbgs Easting: 584,089.5 HQ Stickup: 0.62 m ags HQ Depth: 203.6 mbgs Northing: 6,975,003.3 Westbay Stickup: 0.62 m ags RC 6" 0-8.8m, 4.5" 8.8-200.3 m; Westbay Depth: #293# m bgs Elevation: 1184.95 m asl DDH HQ 200.3-293 m Survey Type: RTK GPS WL: 220.73 m bgs (15-Jul-15; Port 6) LITHOLOGY EC Elev. pH (masl) Depth (m) Depth (m) Airlift Yield (USGPM) EC= µS/cm 200 200 *Hole drilled RC to 200.3 m by May 26, 2015 2:45 am. Hole dry to depth. Resumed drilling May 30, 2015 205 980 04:00am using diamond rig advancing HWT casing 205 followed by HQ drilling. Port 10 210 975 210 *Formation grabby on rods at ~213 m, circulation is 215 970 redulced by half. Fracture at ~215 m results in full 215 circulation loss. Partial return after 215 m, lost again at Port 9 218 m, and then parital return thereafter (unchanged HQ rods 220 965 220 to end of hole). Port 8 225 960 225 Port 7 230 955 230 *Rusty fractures ~230-234.5 m. Friable in places from 233.6-234 m. 235 950 235 Sampled *Rusty fractures ~238-242 m. 240 945 240 Port 6 Port 5 245 940 245 Port 4 250 935 250 Port 3 Westbay 255 930 255 MP38 w/ Glycol MIXED MAFIC GNEISS below 260 925 Schistose band with minor felsic component. Silicified, 260 225m interstitial carbonate and weak epidote altn. 265 920 265 270 915 270 *Three clayey seams 270.15-270.25m. *Rusty fractures ~272-277 m. 275 910 275 *Rusty fractures ~278-287 m. 280 905 280 285 900 285 Port 2 MIXED MAFIC GNEISS Port 1 Fresh schist. Foliated and strongly silicifed. Minor cross cutting carb veinlets. 290 895 290 End of hole 292.9 m. 295 890 295 *Comments from supervising hydrogeologist; lithology logged by Kaminak geologist. Datum: UTM NAD83 Zone 7 03-04-2016 P:\A362-4 (Coffee Gold Project - Hydrogeology)\Data\BH Logs\Quicklog\2015\Version 2 (LF)\BH05WB v3.bor 300 885 300