Proposed Waste Water Disposal Facility CLIENT: YTG Community Services PROJECT NO. - BOREHOLE NO. Lagoon Site DRILL: CME75 Hollow Stem Auger 704-ENVH2O03089-01 BH14-02 Ross River, YT 6874510N; 632605E; Zone 8 ELEVATION: 696.4 m DISTURBED SHELBY TUBE A-CASING CORE SAMPLE TYPE NO RECOVERY SPT GROUT SLOUGH DRILL CUTTINGS BACKFILL TYPE BENTONITE PEA GRAVEL SAND SALINITY (ppt) CLAY (%) 6 18 12 24 20 406080 GROUND ICE SPT (N) SILT (%) SOIL DESCRIPTION 40 20 60 2040 6080 80 SAND (%) AND DESCRIPTION SPT (N) 204060 80 LIQUID PLASTIC M.C. Depth (m) COMMENTS GTC14-02 Elevation (m) GRAVEL (%) SAMPLE TYPE 20 406080 20406080 SAMPLE NUMBER 0 ORGANICS - grass, rootlets, soil seasonally frozen, dark UNFROZEN brown. 696.0 SILT - trace sand, firm, moist, brown. GRAVEL - sandy, trace silt, compact subrounded particles, 1 well graded, damp to moist, grey, trace to some cobbles, trace boulders. 695.0 2 694.0 3 693.0 SILT - some clay, trace sand, firm, moist to wet, grey. 4 692.0 SPT1 11 5 691.0 0 - frozen, permafrost FROZEN SPT2 30 s V , 10-50% - ice lens 2 cm thick 6 690.0 7 - ice lens 1 cm to 2 cm thick SPT3 24 689.0 - ice lens 1 cm to 3 cm thick SPT4 29 8 - ice lens 1 cm to 2 cm thick 688.0 SPT5 34 9 0 SPT6 30 687.0 10 END of BOREHOLE @ 10.0 m. 686.0 25 mm PVC standpipe installed to 4.5 m. Ground Temperature Cable installed inside 25 mm diameter PVC pipe to 10 m. 11 685.0 12 LOGGED BY: CPC COMPLETION DEPTH: 10m REVIEWED BY: CPC COMPLETE: 14/10/25 DRAWING NO: Page 1 of 1 WHITEHORSE ZONE8.GPJ EBA.GDT 15/03/13 PARTICLESIZEANALYSISREPORT ASTMD422,C136&C117 RossRiverWWDFGeotech.Assess. Project:SampleNo.: SPT02 ENVH2O03089-01 ProjectNo.:MaterialType: LagoonSite Site:SampleLoc.: BH14-02 YTG-CommunityInfrastructureBranch Client:SampleDepth: 5.5-5.95m JackBowers ClientRep.:SamplingMethod: Grab December4,2014 AMT DateTested:By:Datesampled: November27,2014 SILT-someclay SoilDescription 2 : SampledBy: CPC USCClassification:Cu: 6.9 MoistureContent:Cc: 1.344.9% Particle Sand Gravel Percent Size Clay Silt Passing Fine Medium Coarse Fine Coarse (mm) 75 400 3"2"1.5"1"3/4"1/2"3/8"48101620304060100200 100 50 38 90 25 19 80 12.5 10 70 5 60 2 100 0.85 100 50 0.425 100 0.25 100 40 0.15 100 PERCENT PASSING 30 0.075 99.7 0.0285 88.0 SoilDescriptionProportions(%): 20 0.0189 77.1 Clay 1 12Sand0 0.0117 60.3 10 Silt88Gravel0 0.0086 49.4 0.0062 37.6 0 755037.5251912.59.54.7520.850.4250.250.150.0750.0370.00050.001 0.0020.0050.01 0.0031 19.8 PARTICLESIZE(mm) 0.0013 7.9 Notes: 1 Theupperclaysizeof2um,pertheCanadianFoundationEngineeringManual 2 Thedescriptionisvisuallybased&subjecttoEBAdescriptionprotocols Specification: Remarks: ReviewedBy: P.Eng. Datapresentedhereonisforthesoleuseofthestipulatedclient.TetraTechEBAisnotresponsible,norcanbeheldliable,forusemadeofthis reportbyanyotherparty,withorwithouttheknowledgeofTetraTechEBA.Thetestingservicesreportedhereinhavebeenperformedtorecognized industrystandards,unlessnoted.Nootherwarrantyismade.Thesedatadonotincludeorrepresentanyinterpretationoropinionofspecification complianceormaterialsuitability.Shouldengineeringinterpretationberequired,TetraTechEBAwillprovideituponwrittenrequest.