CLIENT: YTG Community Services Proposed Waste Water Disposal Facility PROJECT NO. - BOREHOLE NO. DRILL: CME75 Solid Stem Auger Lagoon Site 704-ENVH2O03089-01 BH14-03 6874512N; 632551E; Zone 8 Ross River, YT ELEVATION: 697.4 m NO RECOVERY SPT DISTURBED SHELBY TUBE A-CASING CORE SAMPLE TYPE SLOUGH DRILL CUTTINGS SAMPLE NUMBER GROUT SAND BACKFILL TYPE BENTONITE PEA GRAVEL BULK DENSITY (kg/m 3 ) CLAY (%) 1400 1800 1600 2000 20 406080 GROUND ICE SPT (N) SILT (%) SOIL DESCRIPTION 40 20 60 2040 6080 80 AND SAND (%) DESCRIPTION 204060 80 LIQUID Depth (m) PLASTIC M.C. COMMENTS Elevation (m) GRAVEL (%) SAMPLE TYPE 20 406080 20406080 0 ORGANICS - grass, rootlets, soil seasonally frozen, dark brown. FROZEN SAND - trace silt, compact, medium to coarse grained, moist, grey. UNFROZEN 697.0 GRAVEL - sandy, trace silt, compact subrounded particles, well graded, damp to 1 moist, grey, trace to some cobbles, trace boulders. 696.0 2 695.0 3 FROZEN 694.0 s V , 10-30% SILT - clayey, trace sand, firm, frozen, visible ice, ice lenses throughout up to 10 cm thick, grey. 4 G1 693.0 - ice lens approx. 20 cm thick G2 5 G3 692.0 103 G4 6 691.0 7 G5 341 690.0 - ice lens approx. 20 cm thick G6 8 689.0 G7 9 688.0 - ice lens approx. 40 cm thick 10 687.0 END of BOREHOLE @ 10.5 m. 11 25 mm diameter PVC pipe installed to 10 m for future installation of ground temperature cable. 686.0 12 LOGGED BY: CPC COMPLETION DEPTH: 10.5m REVIEWED BY: CPC COMPLETE: 14/10/25 DRAWING NO: Page 1 of 1 WHITEHORSE ZONE8.GPJ EBA.GDT 15/03/13 PARTICLESIZEANALYSISREPORT ASTMD422,C136&C117 RossRiverWWDFGeotech.Assess. Project:SampleNo.: G1 ENVH2O03089-01 ProjectNo.:MaterialType: LagoonSite Site:SampleLoc.: BH14-03 YTG-CommunityInfrastructureBranch Client:SampleDepth: 4.1-4.3m JackBowers ClientRep.:SamplingMethod: Grab December4,2014 AMT DateTested:By:Datesampled: November27,2014 CLAYandSILT-tracesand SoilDescription 2 : SampledBy: CPC USCClassification:Cu: #N/A MoistureContent:Cc: #N/A35.8% Particle Sand Gravel Percent Size Clay Silt Passing Fine Medium Coarse Fine Coarse (mm) 75 400 3"2"1.5"1"3/4"1/2"3/8"48101620304060100200 100 50 38 90 25 19 80 12.5 10 70 5 100 60 2 100 0.85 99 50 0.425 99 0.25 99 40 0.15 99 PERCENT PASSING 30 0.075 98.7 0.0281 93.7 SoilDescriptionProportions(%): 20 0.0184 86.8 Clay 1 26Sand1 0.0111 77.0 10 Silt72Gravel0 0.0081 69.1 0.0058 60.2 0 755037.5251912.59.54.7520.850.4250.250.150.0750.0370.00050.001 0.0020.0050.01 0.0030 38.5 PARTICLESIZE(mm) 0.0013 17.8 Notes: 1 Theupperclaysizeof2um,pertheCanadianFoundationEngineeringManual 2 Thedescriptionisvisuallybased&subjecttoEBAdescriptionprotocols Specification: Remarks: ReviewedBy: P.Eng. Datapresentedhereonisforthesoleuseofthestipulatedclient.TetraTechEBAisnotresponsible,norcanbeheldliable,forusemadeofthis reportbyanyotherparty,withorwithouttheknowledgeofTetraTechEBA.Thetestingservicesreportedhereinhavebeenperformedtorecognized industrystandards,unlessnoted.Nootherwarrantyismade.Thesedatadonotincludeorrepresentanyinterpretationoropinionofspecification complianceormaterialsuitability.Shouldengineeringinterpretationberequired,TetraTechEBAwillprovideituponwrittenrequest.