PROJECT: BORING ID: ERDC Site Wide Monitoring Plan (13 002-4) KAR13-003 (Completed) LOCATION: WELL ID: Keno Hills Silver District (KHSD) Upper Level at Sadie Ladue (Completed) DRILLING CONTRACTOR: NORTHING: EASTING: Access Consulting Group 7092663 485966 DRILLING EQUIPMENT: GROUND SURFACE ELEV. (masl): TOC ELEVATION (m ags): Midnight Sun Drilling Inc. 1106 1.08 TOTAL DEPTH (m): DRILLING METHOD: WATER DEPTH (m bgs): Air Rotary 16.46 10.84 LOGGED BY: SAMPLING METHOD: DATE STARTED: DATE COMPLETED: KR 2 Feet (0.61 m) Continuous Sampling September 6, 2013September 6, 2013 Graphic Description Well Construction Log Depth (m) Locking Casing Cap Sand Pack 0 0 Casing Bentonite WASTE ROCK, damp TAILINGS, damp 1 1 2 2 SAND, well graded little coarse Sand, damp 3 3 WASTE ROCK (Schist), wood noted @ 4.9m, damp 4 4 5 5 6 6 Grout PVC Riser WASTE ROCK (Graphitic Schist), rounded to angular fragments, dark grey to black, damp 7 7 8 8 9 9 10 10 Silty fine SAND, little Gravel, trace Clay, dark brown to light 11 11 brown, damp to wet 12 12 Bentonite 13 13 14 14 coarse SAND and fine GRAVEL,trace clay, dark grey, wet to saturated Sand Pack 15 15 PVC Screen medium GRAVEL, sub rounded-angular, some Silt, little clay, little coarse sand, grey, saturated 16 16 GRAVEL, Sand. EOH @ 16.45 m 17 PVC End Cap 17 Wells are 2 inches in diameter. NOTES: QZ17-076 - YWB - January 29, 2018 EOH @ 16.5m.