BMC Minerals (No. 1) Project: KZK Hydrogeological Assessment Borehole No: K15-204 Project No: ENVMIN03071-01 Ltd. Location: Kudz Ze Kayah Ground Elev: 1457.23 m Yukon UTM: 414549.469 E; 6815464.484 N; Z 9 NAD83 Fracture Frequency 2 4 6 8 Lithological RQD (%) Comments (m) (m) Description 40 60 80 100 Elevation Run Number Sample Type Depth Along Axis Recovery (%) 40 60 80 100 0 OVERBURDEN - no core recovered 1458 1 2 1459 3 1-2 1460 4 1461 5 1462 6 RHYOLITE SCHIST - curdy textured-flow banded (flows, subvolcanics) Run 3 - 26 Joints 1463 7 3 0 13 1464 8 Run 4 - 40 Joints 1465 9 4 7 13 10 1466 NQ3 Method 11 Run 5 - 43 Joints 1467 12 14 1468 5 13 1469 14 Run 6 - 44 Joints RHYOLITE SCHIST WITH CARBONACEOUS CONTENT - coherent rhyolite flow with carbonaceous content 1470 15 6 15 1471 16 RHYOLITE SCHIST - curdy textured-flow banded (flows, subvolcanics) 17 1472 Run 7 - 33 Joints 18 1473 7 11 19 1474 20 Contractor: Geotech Drilling Completion Depth: 149 m Drilling Rig Type: Hydracore Start Date: 2015 August 8 Logged By: Client Completion Date: 2015 August 8 Reviewed By: SK Page 1 of 8 ROCK CORE ENVMIN03071-01.GPJ EBA.GDT 16/6/22 BMC Minerals (No. 1) Project: KZK Hydrogeological Assessment Borehole No: K15-204 Project No: ENVMIN03071-01 Ltd. Location: Kudz Ze Kayah Ground Elev: 1457.23 m Yukon UTM: 414549.469 E; 6815464.484 N; Z 9 NAD83 Fracture Frequency 2 4 6 8 Lithological RQD (%) Comments (m) (m) Description 40 60 80 100 Elevation Run Number Sample Type Depth Along Axis Recovery (%) 40 60 80 100 20 Run 8 - 31 Joints 1475 21 8 1476 22 RHYOLITE SCHIST WITH CARBONACEOUS CONTENT - coherent rhyolite flow with carbonaceous content 1477 23 Run 9 - 13 Joints RHYOLITE SCHIST - curdy textured-flow banded (flows, subvolcanics) 24 1478 9 25 1479 26 Run 10 - 20 Joints 1480 27 1481 10 28 1482 29 Run 11 - 13 Joints 1483 30 NQ3 Method 11 1484 31 32 1485 Run 12 - 38 Joints 33 13 1486 12 131 34 1487 35 Run 13 - 28 Joints 1488 36 13 1489 37 1490 38 Run 14 - 51 Joints 39 1491 14 19 17 40 Contractor: Geotech Drilling Completion Depth: 149 m Drilling Rig Type: Hydracore Start Date: 2015 August 8 Logged By: Client Completion Date: 2015 August 8 Reviewed By: SK Page 2 of 8 ROCK CORE ENVMIN03071-01.GPJ EBA.GDT 16/6/22 BMC Minerals (No. 1) Project: KZK Hydrogeological Assessment Borehole No: K15-204 Project No: ENVMIN03071-01 Ltd. Location: Kudz Ze Kayah Ground Elev: 1457.23 m Yukon UTM: 414549.469 E; 6815464.484 N; Z 9 NAD83 Fracture Frequency 2 4 6 8 Lithological RQD (%) Comments (m) (m) Description 40 60 80 100 Elevation Run Number Sample Type Depth Along Axis Recovery (%) 40 60 80 100 40 RHYOLITE SCHIST WITH CARBONACEOUS CONTENT - coherent rhyolite flow with 1492 carbonaceous content 41 Run 15 - 44 Joints 1493 RHYOLITE SCHIST - curdy textured-flow banded (flows, subvolcanics) 42 15 1494 15 43 1495 44 TUFF SCHIST - lapilli tuff Run 16 - 40 Joints 1496 45 16 13 1497 46 47 1498 Run 17 - 43 Joint 48 14 1499 17 RHYOLITE TUFF DOMINANT MUDSTONE SCHIST - rhyolite tuff dominant mudstone 49 1500 50 Run 18 - 66 Joints NQ3 Method RHYOLITE SCHIST - curdy textured-flow banded (flows, subvolcanics) 1501 51 22 1502 18 12 52 TUFF SCHIST - lapilli tuff 1503 53 Run 19 - 43 Joints 54 1504 19 14 55 1505 56 Run 20 - 25 Joints 1506 RHYOLITE SCHIST - curdy textured-flow banded (flows, subvolcanics) 57 1507 20 58 CARBONACEOUS MUDSTONE SCHIST - carbonaceous dominant mudstone 1508 59 Run 21 - 31 Joints 1509 60 Contractor: Geotech Drilling Completion Depth: 149 m Drilling Rig Type: Hydracore Start Date: 2015 August 8 Logged By: Client Completion Date: 2015 August 8 Reviewed By: SK Page 3 of 8 ROCK CORE ENVMIN03071-01.GPJ EBA.GDT 16/6/22 BMC Minerals (No. 1) Project: KZK Hydrogeological Assessment Borehole No: K15-204 Project No: ENVMIN03071-01 Ltd. Location: Kudz Ze Kayah Ground Elev: 1457.23 m Yukon UTM: 414549.469 E; 6815464.484 N; Z 9 NAD83 Fracture Frequency 2 4 6 8 Lithological RQD (%) Comments (m) (m) Description 40 60 80 100 Elevation Run Number Sample Type Depth Along Axis Recovery (%) 40 60 80 100 60 21 1510 61 62 1511 Run 22 - 33 Joints 63 11 1512 22 64 1513 65 Run 23 - 27 Joints 1514 66 TUFF SCHIST - lapilli tuff 23 1515 67 1516 68 Run 24 - 25 Joints CARBONACEOUS MUDSTONE SCHIST - carbonaceous dominant mudstone 69 1517 24 70 1518 NQ3 Method 71 Run 25 - 27 Joints 1519 72 1520 25 73 TUFF SCHIST - quartz and/or feldspar crystal tuff 1521 74 Run 26 - 55 Joints 1522 75 26 7 18 1523 76 77 1524 Run 27 - 48 Joints 78 16 1525 27 79 1526 80 Contractor: Geotech Drilling Completion Depth: 149 m Drilling Rig Type: Hydracore Start Date: 2015 August 8 Logged By: Client Completion Date: 2015 August 8 Reviewed By: SK Page 4 of 8 ROCK CORE ENVMIN03071-01.GPJ EBA.GDT 16/6/22 BMC Minerals (No. 1) Project: KZK Hydrogeological Assessment Borehole No: K15-204 Project No: ENVMIN03071-01 Ltd. Location: Kudz Ze Kayah Ground Elev: 1457.23 m Yukon UTM: 414549.469 E; 6815464.484 N; Z 9 NAD83 Fracture Frequency 2 4 6 8 Lithological RQD (%) Comments (m) (m) Description 40 60 80 100 Elevation Run Number Sample Type Depth Along Axis Recovery (%) 40 60 80 100 80 Run 28 - 28 Joints 1527 RHYOLITE SCHIST WITH CARBONACEOUS CONTENT - coherent rhyolite flow with 81 carbonaceous content 28 1528 82 1529 83 Run 29 - 41 Joints 84 1530 29 14 85 1531 86 Run 30 - 76 Joints 1532 87 30 17 25 1533 88 1534 89 Run 31 - 28 Joints 1535 90 NQ3 Method 31 1536 91 92 1537 Run 32 - 22 Joints 93 1538 32 94 1539 95 Run 33 - 21 Joints 1540 RHYOLITE SCHIST - curdy textured-flow banded (flows, subvolcanics), cordierite alteration 96 33 1541 97 1542 98 Run 34 - 14 Joints 99 1543 34 100 Contractor: Geotech Drilling Completion Depth: 149 m Drilling Rig Type: Hydracore Start Date: 2015 August 8 Logged By: Client Completion Date: 2015 August 8 Reviewed By: SK Page 5 of 8 ROCK CORE ENVMIN03071-01.GPJ EBA.GDT 16/6/22 BMC Minerals (No. 1) Project: KZK Hydrogeological Assessment Borehole No: K15-204 Project No: ENVMIN03071-01 Ltd. Location: Kudz Ze Kayah Ground Elev: 1457.23 m Yukon UTM: 414549.469 E; 6815464.484 N; Z 9 NAD83 Fracture Frequency 2 4 6 8 Lithological RQD (%) Comments (m) (m) Description 40 60 80 100 Elevation Run Number Sample Type Depth Along Axis Recovery (%) 40 60 80 100 100 1544 101 Run 35 - 19 Joints TUFF SCHIST - lapilli tuff 1545 102 35 1546 103 1547 104 Run 36 - 28 Joints 1548 105 36 1549 106 107 1550 Run 37 - 37 Joints 108 12 1551 37 109 1552 110 Run 38 - 49 Joints NQ3 Method 1553 111 16 1554 38 112 - heavily disseminated sulphides in host schist 1555 113 Run 39 - 18 Joint 114 1556 - brecciated sulphides 39 115 1557 116 Run 40 - 21 Joints - magnetite bearing sulphides 1558 117 - heavily disseminated sulphides in host schist 40 1559 118 RHYOLITE SCHIST - curdy textured-flow banded (flows, subvolcanics) 1560 119 Run 41 - 28 Joints 1561 120 Contractor: Geotech Drilling Completion Depth: 149 m Drilling Rig Type: Hydracore Start Date: 2015 August 8 Logged By: Client Completion Date: 2015 August 8 Reviewed By: SK Page 6 of 8 ROCK CORE ENVMIN03071-01.GPJ EBA.GDT 16/6/22 BMC Minerals (No. 1) Project: KZK Hydrogeological Assessment Borehole No: K15-204 Project No: ENVMIN03071-01 Ltd. Location: Kudz Ze Kayah Ground Elev: 1457.23 m Yukon UTM: 414549.469 E; 6815464.484 N; Z 9 NAD83 Fracture Frequency 2 4 6 8 Lithological RQD (%) Comments (m) (m) Description 40 60 80 100 Method Elevation Run Number Sample Type Depth Along Axis Recovery (%) 40 60 80 100 120 41 121 1562 122 1563 Run 42 - 14 Joints 123 1564 42 124 1565 125 Run 43 - 30 Joints 1566 126 43 1567 127 1568 128 Run 44 - 11 Joints 129 1569 44 130 1570 NQ3 TUFF SCHIST - coarse grained to ash tuff 131 Run 45 - 16 Joints 1571 132 45 1572 RHYOLITE SCHIST - aphanitic rhyolite (intrusion) 133 1573 134 Run 46 - 13 Joints 1574 135 46 136 1575 TUFF SCHIST - lapilli tuff 137 Run 47 - 28 Joints 1576 138 1577 47 139 MAFIC INTRUSION - mafic intrusions (primarily footwall mafic intrusion) 1578 140 Contractor: Geotech Drilling Completion Depth: 149 m Drilling Rig Type: Hydracore Start Date: 2015 August 8 Logged By: Client Completion Date: 2015 August 8 Reviewed By: SK Page 7 of 8 ROCK CORE ENVMIN03071-01.GPJ EBA.GDT 16/6/22 BMC Minerals (No. 1) Project: KZK Hydrogeological Assessment Borehole No: K15-204 Project No: ENVMIN03071-01 Ltd. Location: Kudz Ze Kayah Ground Elev: 1457.23 m Yukon UTM: 414549.469 E; 6815464.484 N; Z 9 NAD83 Fracture Frequency 2 4 6 8 Lithological RQD (%) Comments (m) (m) Description 40 60 80 100 Elevation Run Number Sample Type Depth Along Axis Recovery (%) 40 60 80 100 140 Run 48 - 19 Joints 1579 141 48 1580 142 1581 143 Run 49 - 16 Joints 144 1582 49 NQ3 Method 145 1583 146 Run 50 - 7 Joints 1584 147 50 1585 148 1586 149 END OF BOREHOLE (149.00 metres) 1587 150 151 1588 152 1589 153 1590 154 1591 155 1592 156 1593 157 1594 158 159 1595 160 Contractor: Geotech Drilling Completion Depth: 149 m Drilling Rig Type: Hydracore Start Date: 2015 August 8 Logged By: Client Completion Date: 2015 August 8 Reviewed By: SK Page 8 of 8 ROCK CORE ENVMIN03071-01.GPJ EBA.GDT 16/6/22