BMC Minerals (No. 1) Project: KZK Hydrogeological Assessment Borehole No: MW15-04 Project No: ENVMIN03071-01 Ltd. Location: Kudz Ze Kayah Yukon Fracture Frequency 2 4 6 8 Lithological RQD (%) (ft) Comments MW15-04S MW15-04D (m) Depth Depth Description 40 60 80 100 Run Number Sample Type Recovery (%) 40 60 80 100 0 0 OVERBURDEN - some gravel and cobbles 2 1 4 6 2 8 3 10 12 4 16 5 18 Sept22/15(S)Sept22/15(D) Sept22/15(S) 14 Sept22/15(D) Run 2 - 12 Joints 2 0 40 6 Run 3 - 18 Joints 20 22 7 24 3 0 15 26 8 28 9 Run 4 - 14 Joints 30 32 10 34 4 0 12 Diamond Drill Method 36 11 38 TUFF SCHIST - with disseminated biotite and fracture filling calcite, fine grained, 12 Run 5 - No core present in 40 grey this run 42 13 5 0 0 44 14 46 48 15 Run 6 - 17 Joints 50 52 16 6 54 17 56 58 18 Run 7 - 15 Joints 60 62 19 7 64 20 Contractor: Geotech Drilling Completion Depth: 33 m Drilling Rig Type: Diamond Drill Start Date: 2015 August 15 Logged By: KRR/ER Completion Date: 2015 August 16 Reviewed By: SK Page 1 of 2 ROCK CORE ENVMIN03071-01.GPJ EBA.GDT 16/6/22 BMC Minerals (No. 1) Project: KZK Hydrogeological Assessment Borehole No: MW15-04 Project No: ENVMIN03071-01 Ltd. Location: Kudz Ze Kayah Yukon Fracture Frequency 2 4 6 8 Lithological RQD (%) (ft) Comments (m) Depth Depth Description 40 60 80 100 MW15-04S MW15-04D Run Number Sample Type Recovery (%) 40 60 80 100 20 66 68 21 Run 8 - 26 Joints 70 72 22 8 74 23 76 78 24 Run 9 - 74 Joints CARBONACEOUS MUDSTONE SCHIST - with banded calcite, black 80 - from 24.0 to 30.0 m, ,weathered, iron oxide staining 25 82 9 25 84 26 86 88 27 Run 10 - 36 Joints Diamond Drill Method 90 TUFF SCHIST 28 92 10 19 12 94 29 96 98 30 Run 11 - 60 Joints 100 31 102 11 19 104 32 106 108 33 END OF BOREHOLE (33.00 metres) Monitoring well D installed to 32.90 metres 110 Monitoring well S installed to 14.10 metres 34 Pipe stickup = 1.05 metres 112 MW15-04D water - 4.20 metres on September 22, 2015 114 MW15-04S water - 4.21 metres on September 22, 2015 35 116 118 36 120 37 122 124 38 126 39 128 130 40 Contractor: Geotech Drilling Completion Depth: 33 m Drilling Rig Type: Diamond Drill Start Date: 2015 August 15 Logged By: KRR/ER Completion Date: 2015 August 16 Reviewed By: SK Page 2 of 2 ROCK CORE ENVMIN03071-01.GPJ EBA.GDT 16/6/22