BMC Minerals (No. 1) Project: KZK Hydrogeological Assessment Borehole No: MW15-07 Project No: ENVMIN03071-01 Ltd. Location: Kudz Ze Kayah Yukon Fracture Frequency 2 4 6 8 Lithological RQD (%) (ft) Comments MW15-07S MW15-07D (m) Depth Depth Description 40 60 80 100 Run Number Sample Type Recovery (%) 40 60 80 100 0 Sept22/15(S)Sept22/15(D) 0 ORGANICS SAND AND GRAVEL 2 1 4 6 2 8 3 Sept22/15(S)Sept22/15(D) 10 12 4 14 16 5 18 6 20 22 7 24 26 8 28 9 30 32 10 34 Diamond Drill Method 36 11 38 12 40 42 13 44 Run 5 - 22 Joints 14 46 5 13 15 MAFIC INTRUSIONS - with biotite porphyroblasts and chlorite groundmass, 48 homogeneous, fine grained 15 Run 6 - 39 Joints 50 52 16 54 6 13 17 56 58 18 Run 7 - 29 Joints 60 62 19 7 64 20 Contractor: Geotech Drilling Completion Depth: 33 m Drilling Rig Type: Diamond Drill Start Date: 2015 August 18 Logged By: KRR/ER Completion Date: 2015 August 18 Reviewed By: SK Page 1 of 2 ROCK CORE ENVMIN03071-01.GPJ EBA.GDT 16/6/22 BMC Minerals (No. 1) Project: KZK Hydrogeological Assessment Borehole No: MW15-07 Project No: ENVMIN03071-01 Ltd. Location: Kudz Ze Kayah Yukon Fracture Frequency 2 4 6 8 Lithological RQD (%) (ft) Comments (m) Depth Depth Description 40 60 80 100 MW15-07S MW15-07D Run Number Sample Type Recovery (%) 40 60 80 100 20 66 68 21 - vein 50-60%, veining with calcite, quartz, dolomite and ankerite Run 8 - 31 Joints 70 72 22 - with biotite porphyroblasts 8 74 23 76 78 24 - from 24.0 to 27.0 m, highly fractured Run 9 - 71 Joints 80 25 82 9 19 24 84 26 86 88 27 Run 10 - 35 Joints Diamond Drill Method 90 28 92 10 12 94 29 96 98 30 Run 11 - 28 Joints 100 31 102 11 104 32 106 108 33 END OF BOREHOLE (33.00 metres) Monitoring well D installed to 32.05 metres 110 Monitoring well S installed to 10.97 metres 34 Pipe stickup = 1.10 metres 112 MW15-07D water - artesian on September 22, 2015 114 MW15-07S water - 1.52 metres on September 22, 2015 35 116 118 36 120 37 122 124 38 126 39 128 130 40 Contractor: Geotech Drilling Completion Depth: 33 m Drilling Rig Type: Diamond Drill Start Date: 2015 August 18 Logged By: KRR/ER Completion Date: 2015 August 18 Reviewed By: SK Page 2 of 2 ROCK CORE ENVMIN03071-01.GPJ EBA.GDT 16/6/22