BMC Minerals (No. 1) Project: KZK Hydrogeological Assessment Borehole No: MW15-08 Project No: ENVMIN03071-01 Ltd. Location: Kudz Ze Kayah Yukon Fracture Frequency 2 4 6 8 Lithological RQD (%) (ft) Comments (m) MW15-08S MW15-08D Depth Depth Description 40 60 80 100 Run Number Sample Type Recovery (%) 40 60 80 100 0 Sept22/15(S) 0 SAND AND GRAVEL 1 4 6 2 Sept22/15(D) Sept22/15(S) Sept22/15(D) 2 8 3 10 12 4 14 16 5 18 6 20 22 7 24 26 8 28 9 30 32 10 34 Diamond Drill Method 36 11 38 12 40 42 13 44 Run 5 - 43 Joints MAFIC TUFF SCHIST - fine grained, light green 14 46 5 7 29 48 15 CARBONACEOUS MUDSTONE SCHIST - grey black Run 6 - 49 Joints 50 52 16 MAFIC TUFF SCHIST - fine grained, light green 54 6 18 16 17 56 58 18 CARBONACEOUS MUDSTONE SCHIST - dark grey, local bands of chlorite Run 7 - 27 Joints 60 schist 62 19 7 64 20 Contractor: Geotech Drilling Completion Depth: 36 m Drilling Rig Type: Diamond Drill Start Date: 2015 August 12 Logged By: KRR/ER Completion Date: 2015 August 12 Reviewed By: SK Page 1 of 2 ROCK CORE ENVMIN03071-01.GPJ EBA.GDT 16/6/22 BMC Minerals (No. 1) Project: KZK Hydrogeological Assessment Borehole No: MW15-08 Project No: ENVMIN03071-01 Ltd. Location: Kudz Ze Kayah Yukon Fracture Frequency 2 4 6 8 Lithological RQD (%) (ft) Comments (m) Depth Depth Description 40 60 80 100 Method MW15-08S MW15-08D Run Number Sample Type Recovery (%) 40 60 80 100 20 66 68 21 MAFIC TUFF SCHIST - fine grained, light green Run 8 - 65 Joints 70 - from 21.0 to 36.0 m, highly fractured bedrock 72 22 8 9 22 74 23 76 78 24 Run 9 - 86 Joints 80 25 82 9 4 29 84 26 86 88 27 Run 10 - 55 Joints 90 28 92 10 0 18 94 Diamond Drill CARBONACEOUS MUDSTONE SCHIST - dark black 29 96 98 30 MAFIC TUFF SCHIST - fine grained, light green Run 11 - 42 Joints 100 31 102 11 8 14 104 32 106 108 33 Run 12 - 46 Joints 110 34 112 12 0 15 114 35 116 118 36 END OF BOREHOLE (36.00 metres) Monitoring well D installed to 35.61 metres 120 Monitoring well S installed to 11.63 metres 37 Pipe stickup = 1.09 metres 122 MW15-08D water - 0.64 metres on September 22, 2015 MW15-08S water - artesian on September 22, 2015 124 38 126 39 128 130 40 Contractor: Geotech Drilling Completion Depth: 36 m Drilling Rig Type: Diamond Drill Start Date: 2015 August 12 Logged By: KRR/ER Completion Date: 2015 August 12 Reviewed By: SK Page 2 of 2 ROCK CORE ENVMIN03071-01.GPJ EBA.GDT 16/6/22