BMC Minerals (No. 1) Project: KZK Hydrogeological Assessment Borehole No: MW15-09 Project No: ENVMIN03071-01 Ltd. Location: Kudz Ze Kayah Yukon Fracture Frequency 2 4 6 8 Lithological RQD (%) (ft) Comments (m) MW15-09S MW15-09D Depth Depth Description 40 60 80 100 Run Number Sample Type Recovery (%) 40 60 80 100 0 Sept22/15(S) 0 SAND AND GRAVEL - poor recovery 2 1 4 Sept22/15(D) Sept22/15(S) Sept22/15(D) 6 2 8 3 10 12 4 14 16 5 18 6 20 22 7 24 26 8 28 9 30 32 10 34 Diamond Drill Method 36 11 38 12 40 42 13 44 14 46 48 15 50 52 16 54 17 56 58 Run 6 - 12 Joints 6 0 40 18 Run 7 - 12 Joints 60 62 19 7 0 10 64 20 Contractor: Geotech Drilling Completion Depth: 42 m Drilling Rig Type: Diamond Drill Start Date: 2015 August 10 Logged By: KRR/ER Completion Date: 2015 August 10 Reviewed By: SK Page 1 of 3 ROCK CORE ENVMIN03071-01.GPJ EBA.GDT 16/6/22 BMC Minerals (No. 1) Project: KZK Hydrogeological Assessment Borehole No: MW15-09 Project No: ENVMIN03071-01 Ltd. Location: Kudz Ze Kayah Yukon Fracture Frequency 2 4 6 8 Lithological RQD (%) (ft) Comments (m) Depth Depth Description 40 60 80 100 MW15-09S MW15-09D Run Number Sample Type Recovery (%) 40 60 80 100 20 66 68 21 MAFIC VOLCANIC SCHIST Run 8 - 32 Joints 70 72 22 8 0 11 74 23 76 78 24 Run 9 - 72 Joints 80 25 82 9 0 24 84 26 86 CARBONACEOUS MUDSTONE SCHIST 88 27 MAFIC VOLCANIC SCHIST Run 10 - 52 Joints 90 28 92 10 0 17 94 29 96 98 30 Run 11 - 70 Joints 100 Diamond Drill Method 31 102 11 16 23 104 32 106 108 33 Run 12 - 68 Joints 110 34 112 12 7 23 114 35 116 118 36 Run 13 - 79 Joints 120 37 122 13 26 124 38 126 39 128 Run 14 - 71 Joints 130 40 Contractor: Geotech Drilling Completion Depth: 42 m Drilling Rig Type: Diamond Drill Start Date: 2015 August 10 Logged By: KRR/ER Completion Date: 2015 August 10 Reviewed By: SK Page 2 of 3 ROCK CORE ENVMIN03071-01.GPJ EBA.GDT 16/6/22 BMC Minerals (No. 1) Project: KZK Hydrogeological Assessment Borehole No: MW15-09 Project No: ENVMIN03071-01 Ltd. Location: Kudz Ze Kayah Yukon Fracture Frequency 2 4 6 8 Lithological RQD (%) (ft) Comments (m) Depth Depth Description 40 60 80 100 MW15-09S MW15-09D Run Number Sample Type Recovery (%) 40 60 80 100 40 132 14 9 24 134 41 136 Diamond Drill Method 42 138 END OF BOREHOLE (42.00 metres) Monitoring well D installed to 40.89 metres 140 Monitoring well S installed to 17.27 metre 43 Pipe stickup = 0.58 metres 142 MW15-09D water - artesian on September 22.2015 MW15-09S water - 0.1 metres on September 22, 2015 144 44 146 45 148 150 46 152 154 47 156 48 158 160 49 162 50 164 166 51 168 170 52 172 53 174 176 54 178 180 55 182 56 184 186 57 188 190 58 192 59 194 196 60 Contractor: Geotech Drilling Completion Depth: 42 m Drilling Rig Type: Diamond Drill Start Date: 2015 August 10 Logged By: KRR/ER Completion Date: 2015 August 10 Reviewed By: SK Page 3 of 3 ROCK CORE ENVMIN03071-01.GPJ EBA.GDT 16/6/22