BMC Minerals (No. 1) Project: KZK Hydrogeological Assessment Borehole No: MW15-11 Project No: ENVMIN03071-01 Ltd. Location: Kudz Ze Kayah Yukon Fracture Frequency 2 4 6 8 Lithological RQD (%) (ft) Comments MW15-11S MW15-11D (m) Depth Depth Description 40 60 80 100 Run Number Sample Type Recovery (%) 40 60 80 100 0 Nov8/15(S) Nov8/15(D) 0 OVERBURDEN - poor recovery 2 1 4 6 2 8 3 10 Nov8/15(S) Nov8/15(D) 12 4 14 16 5 18 6 20 22 7 24 TUFF SCHIST - lapilli tuff, rhyolitic and calcareous within grey, fine grained ash 26 8 matrix Run 4 - 47 Joints 28 9 30 4 3 16 32 10 34 Diamond Drill Method 36 11 Run 5 - 71 Joints 38 12 40 5 0 24 42 13 44 14 46 Run 6 - 50 Joints 48 15 50 6 5 17 52 16 54 17 56 Run 7 - 39 Joints 58 18 60 7 12 13 62 19 MAFIC INTRUSIONS - gradational from top to bottom, heavily disseminated 64 biotite in grey, fine grained ash matrix to massive biotite and calcite schist 20 Contractor: Geotech Drilling Completion Depth: 35.5 m Drilling Rig Type: Diamond Drill Start Date: 2015 November 6 Logged By: KRR/ER Completion Date: 2015 November 7 Reviewed By: SK Page 1 of 2 ROCK CORE ENVMIN03071-01.GPJ EBA.GDT 16/6/22 BMC Minerals (No. 1) Project: KZK Hydrogeological Assessment Borehole No: MW15-11 Project No: ENVMIN03071-01 Ltd. Location: Kudz Ze Kayah Yukon Fracture Frequency 2 4 6 8 Lithological RQD (%) (ft) Comments (m) Depth Depth Description 40 60 80 100 MW15-11S MW15-11D Run Number Sample Type Recovery (%) 40 60 80 100 20 66 Run 8 - 59 Joints 68 TUFF SCHIST - lapilli tuff, rhyolitic and calcareous within grey, fine grained ash 21 matrix, abundance of lapilli decreases with depth 70 8 20 72 22 74 23 RHYOLITE SCHIST - very siliceous coherent with local pepperitic textures Run 9 - 18 Joints 76 78 24 80 9 25 82 84 26 Run 10 - 19 Joints 86 88 27 90 10 MAFIC INTRUSIONS - biotite, calcite and chlorite schist with rounded calcite 28 92 phenocrysts Diamond Drill Method 94 29 Run 11 - 24 Joints 96 98 30 100 11 31 102 104 32 Run 12 - 28 Joints 106 TUFF SCHIST - fine grained, grey, with muscovite cleavage 108 33 12 0 110 34 112 No Core 114 35 116 END OF BOREHOLE (35.50 metres) Monitoring well D installed to 35.20 metres 118 36 Monitoring well S installed to 7.00 metres 120 Pipe stickup = 1.10 metres MW15-11D water - artesian on November 8, 2015 37 122 MW15-11S water - 2.13 metres on November 8, 2015 124 38 126 39 128 130 40 Contractor: Geotech Drilling Completion Depth: 35.5 m Drilling Rig Type: Diamond Drill Start Date: 2015 November 6 Logged By: KRR/ER Completion Date: 2015 November 7 Reviewed By: SK Page 2 of 2 ROCK CORE ENVMIN03071-01.GPJ EBA.GDT 16/6/22