BMC Minerals (No. 1) Project: KZK Hydrogeological Assessment Borehole No: WW15-02 Project No: ENVMIN03071-01 Ltd. Location: Kudz Ze Kayah Yukon UTM: 414843 E; 6815770 N; Z 9 Soil Notes and (ft) (m) WW15-02 Depth Depth Description Comments 20 66 - damp, grey 68 21 70 72 22 74 22.90 m 23 76 78 - water in returns 24 80 25 82 84 - fresh, dark grey 26 86 88 27 90 28 92 94 Screen, 20 29 slot, schedule 96 DHH Method 40 PVC, 152mm OD, 98 133mm ID 30 100 31 102 104 32 106 108 33 110 34 112 114 35 35.00 m 116 118 36 Solid casing, 120 schedule 40 37 PVC 152mm 122 OD, 133mm ID 124 38 38.10 m END OF BOREHOLE (38.10 metres) 126 water - 0.84 metres above ground on October 3, 2015 PVC liner installed from 0.76 to 3.81 metres 39 128 Note: Open hole from 3.4 to 38.1 metres 130 40 Contractor: Midnight Sun Drilling Completion Depth: 38.1 m Drilling Rig Type: Air Rotary Start Date: 2015 July 30 Logged By: AJS Completion Date: 2015 July 30 Reviewed By: SK Page 2 of 2 ENV-DETAILED WELL ENVMIN03071-01.GPJ EBA.GDT 16/6/22 FILE:ENVMIN03071|JULY2016|ISSUEDFORUSE Site: KudzZeKyah JobNo.: ENVMIN03071 WellID: WW15-02 Date: 30-Jul-15 DevelopmentMethod: Jettingandairlifting DevelopmentRecord Turbidity TimeSpent EstimatedPurgeRate TotalVolume TotalVolume (estimated Developing DuringDevelopment PurgedDuring PurgedDuring tablespoonssand Date Time (min) (USGPM) Development(gal) Development(L) in5galpail)Notes 16:35 0 25 0 0 - commencedevelopment 16:36 1 25 25 95 4 16:42 7 25 175 662 1 30July,2015 16:51 16 25 400 1514 0.3 17:00 25 25 625 2366 0.3 ceasedevelopment,turbiditybelowdesired0.5 17:10 35 25 875 3312 0.3 tablespoonsforapprox20min Notes:Didnotsurgeduringdevelopmentasdrillerworriedaboutpressureblowingwatertosurfaceoutsideofthecasing. 1 ENVMIN03071_Large_Diameter_Well_Development.xlsx