PROJECT: WELL ID: ERDC Site Wide Monitoring Plan (13 002-04) KAR13001 (FM-1) LOCATION: WELL MATERIAL: Keno Hills Silver District (KHSD) Christal Zone DRILLING CONTRACTOR: NORTHING: EASTING: Access Consulting Group 7086562.16 483854.14 GROUND SURFACE ELEV. (masl): DRILLING EQUIPMENT: TOC ELEVATION (m ags): Midnight Sun Drilling Inc. 913.1 0.5 TOTAL DEPTH (m): DRILLING METHOD: WATER DEPTH (m bgs): Air Rotary 182.3 21.431 LOGGED BY: SAMPLING METHOD: DATE STARTED: DATE COMPLETED: MR/LF Logged by major lithology August 22, 2013August 24, 2013 Graphic Air Lift Flow Rate Description Well Construction Log Depth (m) -10 -10 0 0 Overburden Casing 10 10 Quartzite 20 20 Graphite Schist 30 30 Quartzite < 1 gpm Graphite Schist 40 40 Quartzite 50 50 Schist 10-15 gpmp pm 60 60 Quartzite 70 70 Schist PVC Riser 20-25 g 20-25 gp 20-25 gpm Quartzite 0 30 gp 30 gpm 80 80 Graphite Schist DRAFT T Quartzite Open Hole Graphite Schist 90 90 Schist Quartzite 35 gpm Schist 100 100 Quartzite Sericite Schist 110 40-45 gpm 110 Quartzite Greenstone Quartzite 120 120 Greenstone Quartzite Graphite Schist 130 130 Quartzite PVC Screen 50-55 gpm Graphite Schist Quartzite 140 140 Schist 65-75 gpm Graphite Schist PVC Riser Sericite Schist 150 65-75 gpm 150 Graphite Schist Greenstone PVC Screen 70-80 gpm 160 160 Mineralized Vein Greenstone 70-80 gpm Mineralized Vein 170 170 70-80 gpm Graphite Schist Slough Non-mineralized Vein Graphite Schist 180 180 Quartzite 190 190 Overburden Borehole Diameter: 7 3/8" NOTES: Bedrock Borehole Diameter: 6"