PROJECT: WELL ID: ERDC Site Wide Monitoring Plan (13 002-04) KAR13002 (FM-2) LOCATION: WELL MATERIAL: Keno Hills Silver District (KHSD) Lightning Zone DRILLING CONTRACTOR: NORTHING: EASTING: Access Consulting Group 7086770.45 484025.71 GROUND SURFACE ELEV. (masl): DRILLING EQUIPMENT: TOC ELEVATION (m ags): Midnight Sun Drilling Inc. 912.23 1.68 TOTAL DEPTH (m): DRILLING METHOD: WATER DEPTH (m bgs): Air Rotary 244.4 29.615 LOGGED BY: SAMPLING METHOD: DATE STARTED: DATE COMPLETED: MR/EB Logged by major lithology August 26, 2013August 28, 2013 Graphic Air Lift Flow Rate Description Well Construction Log Depth (m) 0 0 Casing Sericite Schist 20 20 1-2 gpm 40 40 60 60 Quartzite 80 80 DRAFT PVC Riser 100 100 Sericite Schist 1-2 gpm 120 120 Quartzite 140 140 Sericite Schist Graphite Schist 10-12 gpm Sericite Schist 160 160 Quartzite 180 180 Open Hole PVC Screen 40gpm PVC Riser Non-mineralized Vein 200 200 Mineralized Vein Quartzite 40 gpm PVC Screen Stringer Zone PVC End Cap 220 220 Graphite Schist Mineralized Vein Slough 38 gpm Quartzite Graphite Schist 240 240 57 gpm Overburden Borehole Diameter: 7 3/8" NOTES: Bedrock Borehole Diameter: 6"