PROJECT: BORING ID: KAR16-020 Bermingham Hydrogeological Testing and Permitting LOCATION: WELL ID: Bermingham, Keno Hill, Yukon KAR16-020 DRILLING CONTRACTOR: NORTHING: EASTING: Alexco Environmental Group 7086854.92 479109.73 DRILLING EQUIPMENT: GROUND SURFACE ELEV. (masl): TOC ELEVATION (m ags): Midnight Sun Drilling Inc. 1335.85 1 TOTAL DEPTH (m): DRILLING METHOD: WATER DEPTH (m bgs): Truck Mounted Sandvik Marlin M5 Air Rotary 145.34 12.3 LOGGED BY: SAMPLING METHOD: DATE STARTED: DATE COMPLETED: Cyclone E Roy October 19, 2016October 22, 2016 Graphic Description Well Construction Log Depth (m) Downhole 0 0 overburden 6" steel casing 10 10 20 20 graphitic schist 30 30 40 40 Rumbly rocks quartzite and schist 50 50 6" open borehole 60 60 70 70 sericite schist 80 80 90 90 quartzite Rumbly rocks 100 100 greenstone 110 110 quartzite 120 120 quartzite with minor schist sericite schist 130 130 Caving quartzite with minor schist Excessive caving 140 140 NOTES: Borehole abbandonned at 460 ft due to excessive caving. Azimuth 0°, Dip -90°. QZ18-044 - YWB 2018-08-06