Borehole Log: 14-MW05-7 Project No: 1043-0401 14-BH05-12 Project: Whitehorse Airport Client: PWGSC Logged By: RW Location: Whitehorse Checked By: JBM SUBSURFACE PROFILE SAMPLE Organic Vapour Rdg. Well Completion Details PPM Description 100 300 500 700 900 ft m Ground Surface Flush Mtd 0 CONCRETE 1 Concrete GRAVEL 12-1 2 Gravel, compact, dry Bentonite 3 SAND 1 Sand, dense, brown, dry 4 Sand 5 Solid Pipe 6 12-2 2 7 8 Slotted Pipe 9 2.7m: saturated 12-3 3 10 11 12-4 12 Sand 13 4 14 12-5 15 16 Cap 5 17 18 Caving 19 12-6 6 20 End of Borehole 21 22 23 7 24 Hole Dia: 10 cm Drilled By: Geotech Well Dia: 55mm Grnd Elev: NA Drill Method: Geoprobe TOC Elev: NA Drill Date: 05/08/19 Sheet: 1 of 1