Borehole Log: 14-MW05-8 Project No: 1043-0401 14-BH05-13 Project: Whitehorse Airport Client: PWGSC Logged By: RW Location: Whitehorse Checked By: JBM SUBSURFACE PROFILE SAMPLE Organic Vapour Rdg. Well Completion Details PPM Description 100 300 500 700 900 ft m Ground Surface Flush Mtd 0 CONCRETE Concrete 1 GRAVEL 2 Gravel, compact, dry 13-1 3 SAND 1 Sand, dense, brown, dry 4 Sand 13-2 5 Solid Pipe 6 Bentonite 2 13-3 7 8 9 2.7m: saturated 13-4 3 10 Slotted Pipe 11 12 Sand 13 13-5 4 14 15 16 5 17 18 Cap 19 13-6 Caving 6 20 End of Borehole 21 22 23 7 24 Hole Dia: 10 cm Drilled By: Geotech Well Dia: 55mm Grnd Elev: NA Drill Method: Geoprobe TOC Elev: NA Drill Date: 05/08/20 Sheet: 1 of 1