Borehole No: 20BH01 Project: Phase II ESA - Thompson Drive Residential Dev. Project No: ENW.PENW03024-01 Location: Lot 1, Group 575, Plan 50957 Ground Elev: 689.704 m Watson Lake, Yukon Soil Notes and (m) (m) 20MW01S 20MW01D Depth Description Comments Elevation Sample Type Vapour readings (ppmv) 1234 0 SAND AND GRAVEL - some small cobbles, moist, brown, coarse sand and gravel 1 688 2 3 686 SAND - few small cobbles, moist, brown, coarse sand 4 5 684 6 7 682 8 - some silt and clay, tightly packed 9 680 10 MW01SMW01D MW01SMW01D - some gravel, grey, medium to coarse sand 11 678 12 13 676 14 - 200 mm thick organic lens - dark brown to black, some partially petrified wood 15 674 16 - trace silt, damp, soft to firm, fine sand 17 - no visible gravel, well graded, moist, fine to medium sand 672 18 Sonic Solid stem auger Method 19 SILT - sandy, moist to wet, stiff, medium plastic, some grey 670 20 - wetter 21 668 22 23 - dryer 666 24 25 Contractor: Midnight Sun Drilling Inc. Completion Depth: 39.62 m Drilling Rig Type: Track mounted Start Date: 2020 July 21 Logged By: SB/JH Completion Date: 2020 August 12 Reviewed By: BB Page 1 of 2 ENVIRONMENTAL ENW-PENW03024-01.GPJ EBA.GDT 20-10-9 Borehole No: 20BH01 Project: Phase II ESA - Thompson Drive Residential Dev. Project No: ENW.PENW03024-01 Location: Lot 1, Group 575, Plan 50957 Ground Elev: 689.704 m Watson Lake, Yukon Soil Notes and (m) (m) Depth Description Comments Elevation 20MW01S 20MW01D Sample Type Vapour readings (ppmv) 1234 25 664 26 27 SAND - moist, trace gravel lenses, trace silt lenses, coarse sand lenses, fine to medium sand 662 28 29 660 30 - 200 mm thick organic intrusion - partially petrified wood 31 658 32 Sonic Method 33 656 34 35 654 36 - wet to very wet, medium to coarse sand and gravel 37 652 38 - gravelly, moist, fine sand SILT - sandy, moist to wet, stiff, medium plastic, some grey 39 650 END OF BOREHOLE (39.62 metres) 40 slough - 38.71 metres below ground surface 20MW01D installed to 38.71 metres below ground surface 41 water at 8.87 metres below ground surface on August 15, 2020 20MW01S installed to 22.86 metres below ground surface 648 water at 9.63 metres below ground surface on August 15, 2020 42 Note: Not logged for geotechnical purposes. 43 646 44 45 644 46 47 642 48 49 640 50 Contractor: Midnight Sun Drilling Inc. Completion Depth: 39.62 m Drilling Rig Type: Track mounted Start Date: 2020 July 21 Logged By: SB/JH Completion Date: 2020 August 12 Reviewed By: BB Page 2 of 2 ENVIRONMENTAL ENW-PENW03024-01.GPJ EBA.GDT 20-10-9